![Samsung IAB Series Скачать руководство пользователя страница 78](http://html1.mh-extra.com/html/samsung/iab-series/iab-series_installation-manual_4300036078.webp)
LED R&D Lab(VD)
77
□
Module assembly
①
Attach the adsorber to
the module to be
assembled.
Set x-y seam with
peripheral module.
② Assemble 23 screws.
③
Align the z-axis with the
surrounding module using a
height adjustment screw. (Refer
to the next page)
④
Central Bridge Board
assembly.
Press the floating connector part
once.
Assemble 23
screws
Step adjustment
point
※
Step adjustment points are not required
sections, and work only on sections that require
height adjustment.
Assemble 8 Bridge
Board Screws
Assem
bling
Assem
bling
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
Module to
work with
Product disassembly method – 4) LED module replacement
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 0 9...
Страница 2: ...LED R D Lab VD 1 Revision History Version Date Y M D Description 0 9 2022 04 23 P1 68 standard release...
Страница 56: ...Thank you...
Страница 70: ...LED R D Lab VD 69 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state...