LED R&D Lab(VD)
31
②
L/R
SPK
Cable
연결
①
Relay
Cable
연결
③
BN39-
02743B
④
BN39-
02743B
⑤
BN39-
02743A
⑥
BN39-
02776A
Cable
고정용
고리 사출물
MAIN
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
Inlet
B’d
Inlet
B’d
⑧
Connecting the cable in the frame section below
③
Connect BN39-
02743B (OCM)
to
Main OCM1 connector, spread it over the L1 frame fixed injection, and hang it
.
④
Connect BN39-
02743B (OCM)
to
Main OCM2 connector, spread it over the L2 frame fixed injection, and hang it
.
⑤
Connect BN39-
02743A (OCM)
to
Main OCM3 connector, spread it over the R1 frame fixed injection, and hang it
.
⑥
Connect BN39-
02776A (OCM) to Main OCM4 connector, spread
it over the R2
frame fixed injection, and
hang it.
※
Mark the OCM cable connection location as SILK at the main b’d OCM connector location
LEFT-FRAME
RIGHT-FRAME
L1
L2
R1
R2
OCM
고정
사출물
BN39-02743B
BN39-02743B
BN39-02743A
BN39-02776A
146” Reference
position
110” Reference
position
Fig.1 Main
b’d
Silk
mark
4. FRAME installation and cable connection
Содержание IAB Series
Страница 1: ...LED R D Lab VD LED Display Install Manual IAB Series LH008IAB LH012IAB LH016IAB Ver 0 9...
Страница 2: ...LED R D Lab VD 1 Revision History Version Date Y M D Description 0 9 2022 04 23 P1 68 standard release...
Страница 56: ...Thank you...
Страница 70: ...LED R D Lab VD 69 Product disassembly method 3 Sub Screen Internal decomposition First fully connected state...