www.jouleuk.co.uk | www.joule.ie
56
Transport and Handling
Care must be taken when transporting, storing and installing the equipment:
At least two people should lift the cylinder to prevent injuries.
The cylinder must be stored in a dry area and must never be dropped during handling.
Packaging should only be removed at the installation location.
The cylinder must be installed on a level floor with the required load bearing capability. Installation, ser-
vicing, maintenance and repair must be carried out by a competent person.
The Smart Plumb Compact unit is delivered fully
packaged and fixed to a wooden pallet base. Care
should be taken when transporting the cylinder
unit ensuring that the casing is not damaged by
impact.
Do not remove the protective packaging until the
cylinder unit has reached its final location. This
will help protect the structure and control panel.
The cylinder unit must be transported in an upright position only.
Smart Plumb Compact Installation
Transport and Handling
7
System
Содержание HHSM-G500005-1
Страница 49: ...Heat Pump Installation Guide 49 Electrical Diagram ...
Страница 74: ...www jouleuk co uk www joule ie 74 Controller Symbols ...
Страница 76: ...www jouleuk co uk www joule ie 76 Button Functions ...
Страница 83: ...Heat Pump Installation Guide 83 Figure 1 1 Air Source Heat Pump Unplumbed Smartplumb 1 Heating 1 DHW ...
Страница 84: ...www jouleuk co uk www joule ie 84 Figure 1 2 Air Source Heat Pump Unplumbed Smartplumb 2 Heating 1 DHW ...
Страница 85: ...Heat Pump Installation Guide 85 Figure 1 3 Air Source Heat Pump Unplumbed High Gain Indirect 1 Heating 1 DHW ...
Страница 86: ...www jouleuk co uk www joule ie 86 Figure 1 4 Air Source Heat Pump Unplumbed High Gain Indirect 2 Heating 1 DHW ...
Страница 87: ...Heat Pump Installation Guide 87 Figure 1 5 Air Source Heat Pump Pre Plumbed Smartplumb 1 Heating 1 Cooling ...
Страница 89: ...Heat Pump Installation Guide 89 ...