Floor installation
1
Select pipe directions.
When the directions are selected, drill 3-1/8'' (100mm, for pipe and cables)
and 1-3/4'' (40mm, for drain hose) diameter holes on the wall so that it
slants slightly downwards toward the outdoor for smooth water flow.
2
Install the hanging plate according to the distance and mount it.
3
Install the unit and be sure to arrange the drain hose so that it is leveled
lower than the drain hose connecting port of the indoor unit.
1000
793
45
50
650
101
◆
Use the pattern sheet to select pipe directions.
N
N
N
N
o
o
o
o
tt
tt
e
e
e
e
Drain hose
Drain hose
300mm
or more
300mm
or more
Back side
Unit : mm
E-
9
ENGLISH
Содержание FH052EAMC
Страница 26: ......