Disassembly and Reassembly
3-9
Samsung Electronics
3.4.2 ITB
3.4.3 Fuser
1. Unplug the one connector from OPE PBA and
pull out the ITB unit in the direction of bottom.
1. Remove the Right cover. And remove the 2
connector as shown below.
Caution -
The fuser is very hot. So turn the printer
off and wait until the printer to cool before
replacing it.
2. Remove the 4 screw, and move the shaft as
shown below. And remove the Fuser unit.
Содержание CLP-310
Страница 42: ...Product spec and feature Service Manual 2 31 Samsung Electronics 2 3 11 Initailize Flow ...
Страница 43: ...Product spec and feature Service Manual 2 32 Samsung Electronics ...
Страница 143: ...Reference Information Service Manual 6 6 Samsung Electronics ...
Страница 144: ...Reference Information Service Manual 6 7 Samsung Electronics ...
Страница 145: ...Reference Information Service Manual 6 8 Samsung Electronics ...
Страница 146: ...Reference Information Service Manual 6 9 Samsung Electronics ...