Checking and Testing Operations
To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.
1
Review all the following elements in the installation:
◆
Installation site strength
◆
Piping connection tightness to detect any gas leakages
◆
Connection wiring
◆
Heat-resistant insulation of the piping
◆
Drainage
◆
Earthing wire connection
◆
Correct operations (follow the steps below)
2
Press the On/Off button.
Result:
◆
The indicator lights on the indoor unit flash at
half-second intervals.
◆
While the indoor unit opens, the indoor unit fan runs
to start.
3
Press the button.
Result:
The outdoor unit operates in cooling mode as following
the room temperature.
4
Air flow direction
Press the button one or more times to set the
blades to the 30° or 90° positions.