E-
3
TABLE OF CONTENTS
ACCESSORY PARTS LIST . . . . . . . . . 4
SELECTION OF INSTALLATION PLACE
• Indoor Unit
. . . . . . . . . . . . . . . . . . . . 5
• Outdoor Unit
. . . . . . . . . . . . . . . . . . 5
ELECTRICAL WORK . . . . . . . . . . . . . . 6
INSTALLATION METHOD
• Connecting the Pipe
. . . . . . . . . . . . 8
• Installation Procedures
. . . . . . . . . . 9
• Connection of Refrigerant Piping
. . 10
• Drilling a Hole in the Wall
. . . . . . . . 11
• Drain Hose
. . . . . . . . . . . . . . . . . . 11
AIR PURGE . . . . . . . . . . . . . . . . . . . . 12
REFRIGERANT CHARGING . . . . . . . 13
CHECK AND TEST OPERATION . . . 14
Absolute Checkpoints
1. Drain check
2. Drilling a hole in the wall
Ø70mm
Less than
150mm
Drain hose
Indoor and outdoor
unit connection
Refer to page 11 for detailed procedures.
▼
▼
ENGLISH
POWER SUPPLY LINE,FUSE OR CIRCUIT BREAKER
◆
Always make sure that the power supply is compliant with current safety standards.Always install the air conditioner
in compliance with current local safety standards.
◆
Always verify that a suitable grounding connection is available.
◆
Verify that the voltage and frequency of the power supply comply with the specifications and that the installed power
is sufficient to ensure the operation of any other domestic appliance connected to the same electric lines.
◆
Always verify that the cut-off and protection switches are suitably dimensioned.
◆
Verify that the air conditioner is connected to the power supply in accordance with the instructions provided in the
wiring diagram included in the manual.
◆
Always verify that electric connections (cable entry,section of leads,protections …)are compliant with the electric
specifications and with the instructions provided in the wiring scheme.Always verify that all connections comply with
the standards applicable to the installation of air conditioners.
◆
After completing the installation,always carry out a functional test and provide the instructions on how to operate
the air conditioner to the user.
◆
Do not use the air conditioner in environments with hazardous substances or close to equipment that release free
flames to avoid the occurrence of fires,explosions or injuries.
APV48QOAN_E_IM_00000 2008.10.20 11:5 PM Page 3
Air Marketing Group LLC
141 Kinderkamack Rd, Park Ridge, NJ 07656 Tel: 201-782-1782 Fax: 201-782-1783 Web: www.amgair.com Email: [email protected]