37
English
Instal
lation Pr
oc
edur
e
Performing final check and trial operation
To complete the installation, perform the following checks and tests to ensure that the air conditioner operates
correctly.
1
Check the followings.
•
Strength of the installation site
•
Tightness of pipe connection to detect a gas leak
•
Electric wiring connections
•
Heat-resistant insulation of the pipe
•
Drainage
•
Earth conductor connection
•
Correct operation (follow the steps below)
After finishing the installation of the air conditioner, you should explain the following to the user. Refer to appropriate
pages in the User’s Manual.
1
How to start and stop the air conditioner
2
How to select the modes and functions
3
How to adjust the temperature and fan speed
4
How to adjust the airflow direction
5
How to set the timers
6
How to clean and replace the filters
NOTE
•
When you complete the installation successfully, hand over the User’s Manual and this Installation Manual to the
user for storage in a handy and safe place.
DVM TK Wind-Free 1way IM EN_DB68-07553A-00.indb 37
2017-12-01 오후 2:19:11