Gas leak tests on the outdoor unit is done initially from the factory, but you must test for gas leakage after
the installation.
1
Purge the pipe and run vacuum test. (Pressure should not increase for a minute.)
2
Insert the nitrogen gas so that pressure reaches minimum 2kg/cm2.
3
Use soap water to check the leakage on the connection part.
4
For final vacuum test, leave the outdoor unit for 24 hours under pressure of 28kg/cm2 and check for any
signs of pressure decrease.
5
Discharge the nitrogen gas.
6
Keep the outdoor unit in vacuum status.
7
If length of the pipe exceeds the standard length, charge additional refrigerant.
8
Open the outdoor unit valve and circulate the refrigerant to the indoor unit so that pressure of the entire
pipe becomes even.
Gas leak test and vacuum drying
ki]_TXX^ZXjTWWpiptwhjGz{jluUGGG]X
YWYYTW[TW_GGG㝘㤸G`aXYa\W
Содержание AC BNPDBC Series
Страница 74: ...74 English INSTALLATION PARTS Memo ...
Страница 75: ...75 English INSTALLATION PARTS ...