![Samsung 9395 Скачать руководство пользователя страница 124](http://html.mh-extra.com/html/samsung/9395/9395_installation-manual_357674124.webp)
3
.
Installing the Product
106
English 8/2020. Rev 0.3
3.10.15 Reinstall the Front Panel
1.
Reinstall the front panel to cover the battery rack and prevent further access to high voltage parts of the battery modules.
2.
Locate the hooks that hold the front panel to the slots in the rack frame and insert the front panel to the rack frame. Make
sure all the hooks are inserted to the slot and the panel is flush with the rack frame before screwing.
Figure 3-135: Front panel hooks (four)
3.
Screw in the front panel using the provided M5 screws for each front panel. Fasten the screws using torque of 5.1–6.1 Nm
(50–60 kgf/cm)
Figure 3-136: Front panel screws (eight)
Содержание 9395
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 78: ...3 Installing the Product 60 English 8 2020 Rev 0 3 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 117: ...3 Installing the Product English 8 2020 Rev 0 3 99 Figure 3 130 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...Memo ...
Страница 129: ...www SamsungSDI com ...