3
.
Installing the Product
English 8/2020. Rev 0.3
83
8.
Connect the signal cable “WIRE ASSY MODULE TO MODULE #1" from Module #7 “Left connector” to
Module #8 “Right connector”.
Figure 3-100: Module #7 to Module #8 Signal Cabling
9.
Connect the signal cable “WIRE ASSY MODULE TO MODULE #2" from Module #8 “Left Connector” to
Module #9 “Right Connector.”
Figure 3-101: Module #8 to Module #9 Signal Cabling
Содержание 9395
Страница 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Страница 4: ...English 8 2020 Rev 0 3 ...
Страница 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Страница 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Страница 18: ......
Страница 78: ...3 Installing the Product 60 English 8 2020 Rev 0 3 Figure 3 63 Remove Battery Modules 9 s Front Cover ...
Страница 117: ...3 Installing the Product English 8 2020 Rev 0 3 99 Figure 3 130 AC Input Terminals of SMPS Assembly 1 Phase Type B ...
Страница 126: ...Memo ...
Страница 127: ...Memo ...
Страница 128: ...Memo ...
Страница 129: ...www SamsungSDI com ...