Start-up
−
The prevailing conditions in the plant
section concerned meet the valve sizing
requirements (see information under
'Intended use' in the 'Safety instructions
and measures' section).
Start-up/putting the valve back into opera-
tion
1. Allow the valve to cool down or warm up
to reach ambient temperature before
start-up when the ambient temperature
and process medium temperature differ
greatly or the medium properties require
such a measure.
2. Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
resulting high velocities that can damage
the valve.
3.
Check the valve to ensure it functions
properly.
Содержание EB 8111 EN
Страница 12: ...1 8 EB 8111 8112 EN...
Страница 36: ...7 2 EB 8111 8112 EN...
Страница 49: ...EB 8111 8112 EN 9 11 Servicing...
Страница 50: ...9 12 EB 8111 8112 EN...
Страница 56: ...12 2 EB 8111 8112 EN...
Страница 58: ...13 2 EB 8111 8112 EN...
Страница 64: ...14 6 EB 8111 8112 EN...
Страница 66: ...15 2 EB 8111 8112 EN Annex 5 1 4 13 17 97 14 98 15 8 11 12 16 63 62 96 5 96 Type 3321 DN 15 to 50 NPS to 2...
Страница 67: ...EB 8111 8112 EN 15 3 Annex 15 11 12 16 2 5 1 4 13 17 14 63 62 5 2 8 Type 3321 DN 65 to 100 NPS 2 to 4...
Страница 69: ......
Страница 70: ......
Страница 71: ......