
5-4
EB 14b_EN
January 2022 edition
Subject to technical changes
Installation
Ö
At the end of installation, perform a functional test with the
control signals:
The butter
fl
y valve must close and open correctly according to
the control commands. Detected malfunctions must be
fi
xed
before commissioning, see Chapter “8 Faults”.
Danger due to improperly executed control commands!
Incorrectly executed control commands can cause serious injuries
or even death and cause damage to the pipe system.
Ö
Check the actuator unit and control command., see chapter
“8 Faults”.
5.5.2 Pressure test of the pipe section
The pressure test was already performed on the butter
fl
y valves
by PFEIFFER. Observe the following for the pressure test of a pipe
section with installed butter
fl
y valves:
Ö
First carefully rinse newly installed pipe systems in order to
wash out all foreign matter.
Ö
Ensure the following conditions for the pressure test:
–
Valve open: The test pressure may not exceed the value
1.5 x PN (according to the type plate).
–
Valve closed: The test pressure may not exceed the value
1.1 x PN (according to the type plate).
If a butter
fl
y valve leaks, observe chapter “8 Faults”.
The plant operator is responsible for performing the pressure test.
After Sales Service at PFEIFFER can provide you with support for
the planning and implementation of a pressure test speci
fi
c to
your plant.
5.5.3 Rotary
movement
The rotary movement of the actuator- and switching shaft must be
linear without any jerky movements.
Ö
Open and close the butter
fl
y valve. When doing so, observe
the movement of the actuator shaft.
Ö
Set the maximum and minimum control signal in succession
to check the end positions of the butter
fl
y valve.
Ö
Check the display on the position indicator.
WARNING
Info
5.5.4 Fail-safe
position
Ö
Close the signal pressure line.
Ö
Check whether the butter
fl
y valve moves to the fail-safe posi-
tion, see Chapter “Fail-safe positions in Chapter “3 Design
and principle of operation”.
Содержание EB 14b
Страница 22: ...4 4 EB 14b_EN January 2022 edition Subject to technical changes Shipment and on site transport...
Страница 28: ...6 2 EB 14b_EN January 2022 edition Subject to technical changes Start up...
Страница 30: ...7 2 EB 14b_EN January 2022 edition Subject to technical changes Operation...
Страница 36: ...10 2 EB 14b_EN January 2022 edition Subject to technical changes Decommissioning...
Страница 38: ...11 2 EB 14b_EN January 2022 edition Subject to technical changes Removal...
Страница 42: ...12 4 EB 14b_EN January 2022 edition Subject to technical changes Repairs...
Страница 44: ...13 2 EB 14b_EN January 2022 edition Subject to technical changes Disposal...
Страница 46: ...14 2 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 47: ...14 3 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 48: ...14 4 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 49: ...14 5 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 50: ...14 6 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 56: ...15 6 EB 14b_EN January 2022 edition Subject to technical changes Annex...
Страница 57: ...EB 14b_EN January 2022 edition Subject to technical changes...
Страница 58: ...EB 14b_EN January 2022 edition Subject to technical changes...
Страница 59: ...EB 14b_EN January 2022 edition Subject to technical changes...