
3-4
EB 14b_EN
January 2022 edition
Subject to technical changes
Design and principle of operation
Ö
Push also the bonnet sealing (23) onto the bonnet in the same
way as the body sealing (13).
Fit butter
fl
y valves with a nominal size of DN 300 or NPS12
without body sealing (23).
Ö
Insert the preassembled bonnet (7) into the bearing bore in
the body (1) and adjust with the stud bolts (16).
Ö
Tighten the bonnet (7) with the nuts (17) evenly and in a
criss-cross pattern.
Ö
Push the thrust washer (8) over the free shaft end into position
in the valve body.
Ö
Push the PTFE V-ring packing (9) over the switching shaft into
the body bore and press in with an assembly sleeve. Refer to
the sectional drawing Figure 3-2 for the arrangement of the
V-ring packing.
Ö
Push the thrust piece (15) over the switching valve and press
it into position in the body.
Ö
Insert the set of spring washers (10). Refer to the sectional
drawing Figure 3-2 for the arrangement of the spring wash-
ers.
Ö
Press the bearing bushing (11) into the stuf
fi
ng box (6).
Ö
Fit the preassembled stuf
fi
ng box (6) smoothly over the body
fl
ange and adjust with screws (20).
Ö
Tighten the screws (20) evenly in a criss-cross pattern.
Ö
Adjust the dihedron of the switching shaft parallel to the
valve disc (3) and secure it against further twisting.
Press the switching shaft up against the mating washer (18).
Ö
Drill dowel holes for connecting the switching shaft (2) and
the valve disc (3).
Ö
Pin the disc and shaft with close-tolerance grooved pins (14).
3.5.1.2 Assembling butter
fl
y valves up to
DN
|
300 (NPS12)
Ö
Insert the PTFE seal ring (4) or the metal seat ring including
the corresponding graphite rings (4) into the body.
It is essential to pay attention to cleanliness during assembly.
Ö
Insert the o-ring (24) into the fastening ring (5).
Ö
Place the preassembled fastening ring (5) on the seal ring (4)
and press it in with a hydraulic press.
Ö
Loosen the bonnet (7).
Ö
Push the tension spring (19) into the slot.
Ö
Fasten the bonnet (7) as previously described.
Info
Info
Info
3.5.1.3 Assembling butter
fl
y valves from
DN
|
400 (NPS16)
Ö
Insert the PTFE seal ring (4) or the metal seat ring including
the corresponding graphite rings (4) into the body.
It is essential to pay attention to cleanliness during assembly.
Ö
Place the fastening ring (5) on the seal ring (4) and adjust
with the screws (26).
Ö
Tighten the screws evenly in a criss-cross pattern.
3.5.2
Assembly of butter
fl
y valve BR
|
14b
with adjustable stuf
fi
ng box (type
WNS)
3.5.2.1 Preassembly of the butter
fl
y valves
Ö
Place the valve body (1) on a clean surface at working height
so that the bearing area of the shaft is easy to reach.
Ö
Push the bearing bushing (12a) as far as it will go into the
bearing bore in the valve body.
Ö
Insert the spacer (22) into the bearing bore.
Fit butter
fl
y valves with a nominal size of DN 300 or NPS12
without a spacer (22).
Ö
Insert the valve disc (3) into the body such that the bearing
bores in the disc align with the bearing bore in the body.
Ö
Insert the switching shaft (2) through the bearing bores of the
body and the disc.
Ö
Push the bearing bushing (12b) over the switching shaft as
far as it will go into the bearing bore in the body.
Ö
Insert the spacer (21).
Fit butter
fl
y valves with a nominal size of DN 100 or NPS4 with-
out a spacer (21).
Ö
Screw the stud bolts (16) into the body.
Ö
Insert the mating washer (18) into the provided recess in the
bonnet (7).
Ö
Push also the bonnet sealing (23) onto the bonnet in the same
way as the body sealing (13).
Fit butter
fl
y valves with a nominal size of DN 300 or NPS12
without body sealing (23).
Info
Info
Info
Info
Содержание EB 14b
Страница 22: ...4 4 EB 14b_EN January 2022 edition Subject to technical changes Shipment and on site transport...
Страница 28: ...6 2 EB 14b_EN January 2022 edition Subject to technical changes Start up...
Страница 30: ...7 2 EB 14b_EN January 2022 edition Subject to technical changes Operation...
Страница 36: ...10 2 EB 14b_EN January 2022 edition Subject to technical changes Decommissioning...
Страница 38: ...11 2 EB 14b_EN January 2022 edition Subject to technical changes Removal...
Страница 42: ...12 4 EB 14b_EN January 2022 edition Subject to technical changes Repairs...
Страница 44: ...13 2 EB 14b_EN January 2022 edition Subject to technical changes Disposal...
Страница 46: ...14 2 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 47: ...14 3 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 48: ...14 4 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 49: ...14 5 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 50: ...14 6 EB 14b_EN January 2022 edition Subject to technical changes Certificates...
Страница 56: ...15 6 EB 14b_EN January 2022 edition Subject to technical changes Annex...
Страница 57: ...EB 14b_EN January 2022 edition Subject to technical changes...
Страница 58: ...EB 14b_EN January 2022 edition Subject to technical changes...
Страница 59: ...EB 14b_EN January 2022 edition Subject to technical changes...