background image

EB 8547 EN 

 11

Measures for preparation

4  Measures for preparation

After receiving the shipment, proceed as fol-
lows:
1.  Check the scope of delivery. Compare 

the shipment received with the delivery 
note.

2.  Check the shipment for transportation 

damage. Report any transportation dam-
age.

4.1  Unpacking

Do not remove the packaging if the quick 
exhaust valve is to be transported to another 
location or kept in storage.

Before mounting the quick exhaust valve, 
proceed as follows:
1.  Remove the packaging from the quick 

exhaust valve.

2.  Dispose of the packaging in accordance 

with the valid regulations.

Risk of damage to the quick exhaust valve 
due to foreign particles entering the valve.

Do not remove the protective film until imme

-

diately before mounting.

4.2  Storage

Risk of damage to the quick exhaust valve 
due to improper storage.
Observe the storage instructions. Contact 
SAMSON, if need be.

Storage instructions

 

Protect the quick exhaust valve against 

external influences (e.g. impact, shocks, 

vibration).

 

Do not damage the corrosion protection 
(coating).

 

Protect the quick exhaust valve against 
moisture and dirt. In damp spaces, pre-
vent condensation. If necessary, use a 
drying agent or heating.

 

Observe the storage temperature from 

–40 to +80 °C.

 

Pack the quick exhaust valve in airtight 
packaging.

Note

NOTICE

!

NOTICE

!

Содержание 3711

Страница 1: ...Translation of original instructions EB 8547 EN Type 3711 Quick Exhaust Valve Edition April 2020...

Страница 2: ...uestions about these instructions contact SAMSON s After sales Service aftersalesservice samsongroup com The mounting and operating instructions for the devices are included in the scope of delivery T...

Страница 3: ...4 Measures for preparation 11 4 1 Unpacking 11 4 2 Storage 11 5 Mounting and start up 12 5 1 Mounting position 12 5 2 Attachment and hook up 12 5 3 Pneumatic connections 14 5 3 1 Supply air 14 5 4 St...

Страница 4: ...711 Quick Exhaust Valve is not suitable for the following applications Use outside the limits defined during sizing and by the technical data Furthermore the following activities do not comply with th...

Страница 5: ...fied hazard statements warning and caution notes Furthermore the operat ing personnel must be familiar with the applicable health safety and accident prevention regulations and comply with them 1 1 No...

Страница 6: ...th the exhaust port facing downward or to the side Alternatively fit a suitable cover to protect it against adverse weather conditions Risk of damage to the quick exhaust valve due to lack of protecti...

Страница 7: ...D 3 Production ID 4 Month year 2 2 Article code Quick exhaust valve Type 3711 x x x x x x x 0 Version Standard version 0 Body material Aluminum 0 Stainless steel 1 Pneumatic connection G EXH OUT G 3 8...

Страница 8: ...control pressure decreases After the actuator pressure and control pressure reach a certain differential pressure the diaphragm plate 1 releases the seat of the exhaust port EXH causing the actuator...

Страница 9: ...lass 4 Oil content Class 3 Pressure dew point Class 3 or at least 10 K below the lowest ambient temperature to be expected Flow coefficients KVS Exhaust 10 0 1 KVS Supply check valve 1 3 restriction s...

Страница 10: ...10 EB 8547 EN Design and principle of operation 3 2 Dimensions in mm 85 SW 32 107 57 59 5 47 5 61 SW 24 SW 32...

Страница 11: ...in accordance with the valid regulations Risk of damage to the quick exhaust valve due to foreign particles entering the valve Do not remove the protective film until imme diately before mounting 4 2...

Страница 12: ...alve due to it being combined with a volume booster Do connect the quick exhaust valve in combi nation with a volume booster Risk of damage or malfunction of the quick exhaust valve due to lack of pro...

Страница 13: ...olenoid valve 4 Quick exhaust valve 5 Silencer 6 Restriction SIG OUT EXH 1 2 3 4 5 6 Hook up including purging of actuator spring chamber 1 2 3 4 5 SIG OUT EXH Standard hook up Inscription Port SIG Co...

Страница 14: ...r The quality of the supply air must meet the requirements of ISO 8573 1 concerning par ticle size oil content and pressure dew point see Technical data in section 3 1 5 4 Start up Risk of damage to h...

Страница 15: ...and start up in the restriction screw again if neces sary 4 Secure the access to the restriction screw with the cotter pin Access to the restriction screw secured by the cotter pin Fig 3 Restriction...

Страница 16: ...ype 3711 Quick Exhaust Valve requires no maintenance We recommend regularly checking whether the device is leak tight and whether the pipe screw fitting is screwed on properly 6 2 Preparation for retu...

Страница 17: ...e between quick exhaust valve and pneumatic connections Possible reasons Pipe fittings are loose Recommended action Check whether pipe screw fitting leaks and is screwed on properly If other malfuncti...

Страница 18: ...matic actuator 2 Disconnect the supply air 3 If necessary allow valve components to cool down or heat up 8 2 Removing the quick exhaust valve 1 Put the quick exhaust valve out of opera tion see sectio...

Страница 19: ...e at the following e mail address aftersalesservice samsongroup com Addresses of SAMSON AG and its subsid iaries The addresses of SAMSON AG its subsid iaries representatives and service facilities wor...

Страница 20: ...2020 05 19 English SAMSON AKTIENGESELLSCHAFT Weism llerstra e 3 60314 Frankfurt am Main Germany Phone 49 69 4009 0 Fax 49 69 4009 1507 samson samsongroup com www samsongroup com EB 8547 EN...

Отзывы: