9
Single-Phase 3-Wire
Power Monitoring Wiring
for up to 415 volts
Alternate wiring for Step 4 (connect power meter).
1. Connect the CT1 black wire to port 1 on the power meter and the CT1 white
wire to port 2 on the power meter.
2. Connect the CT3 black wire to port 5 on the power meter and the CT3 white
wire to port 6 on the power meter. Must be completed BEFORE connecting
CT to hot wire.
3. Connect the CT1 so that the L1 hot wire passes through it and the arrow on
the CT points towards the load. Connect the CT3 so that the L3 hot wire
passes through it and the arrow on the CT points towards the load.
4. Connect the L1 hot line voltage reference wire to port 7 on the power meter.
5. Connect the L3 hot line voltage reference wire to port 9 on the power
meter.
6. Install a jumper wire from port 8 to port 10 on the power meter.