4
3-Phase 4-Wire Power
Monitoring Wiring for
up to 480V
1. Wire the CT1, CT2, and CT3 to ports 1-6 on the power meter respectively.
Connect black wires to ports 1,3,5 and white wires to ports 2,4,6. Must be
completed BEFORE connecting CTs to L1, L2, and L3 hot wires.
2. Connect the CT1 so that the L1 hot wire passes through it and the arrow on the
CT points towards the load. Repeat for CT2, and CT3 respectively. Ensure all
CTs are oriented with the arrow pointing towards the load.
3. Connect the L1, L2, L3 hot line voltage reference wire to port 7,8,9 on the power
meter.
4. Connect the neutral line voltage reference wire to port 10 on the power meter.
4. Connect Power Meter