www.larius.com
10
REV.
1 - 06/2020 - Cod. 150142
• The supply cable (
I2
) is provided without plug.
Use a plug which guarantees the plant earthing.
Only a technician or a skilled person should perform the
connection of the plug to the electric cable.
Should anyone use an extension cable between
the tooling and the socket, it must have the same
characteristics as the cable supplied (
minimum
diameter of the wire 2.5 mm
2
) with a maximum
length of 50 mt. Higher lengths and lower
diameters can provoke excessive voltage falls
and also an anomalous working of the equipment.
CONNECTION OF THE TOOLING TO THE POWER SUPPLY
• Check the ON/OFF switch (
I3
) is on the
"OFF" position (0)
before connecting the cable to the mains.
• Place the pressure control knob (
I4
) on the
“MIN”
position
(
turn counterclockwise
).
• Ensure the gun (
I6
) is without nozzle.
I2
I3
OFF
I3
I4
I5
I6
Fig. 2I
Fig. 3I
Fig. 4I
Fig. 5I
Fig. 6I
Miro' for sanitation
WASHING OF THE NEW EQUIPMENT
• The equipment has already been adjusted at our factory with
light mineral oil left inside the pumping group as protection.
Therefore, wash with diluent before sucking the product.
• Fill the tank (
I5
) with the cleaning liquid.
Содержание LARIUS MIRO
Страница 33: ...I n t e n t i o n a l l y b l a n k p a g e...
Страница 36: ...I n t e n t i o n a l l y b l a n k p a g e...