Use of the product
31
9
Use of the product
9.1
User settings
Cup
Before commissioning, half fill the cup as well as the 2 tanks with
lubricant "T".
The cup nut must be tightened moderately. Overtightening quickly
damages the gland packing. A wrench is supplied to allow proper
tightening.
Tightening of the Wet Cup
Verify cup is filled with lubricant T,
Run the pump, then tighten the cup after 10
minutes, again after 1 hour, then after 1 day of
operation,
In the event of a leak, the cup must be tightened.
Tightening procedure
Depressurize the Air motor (see depressurization
procedure),
Depressure
the product circuit (see
depressurization procedure),
Tighten the cup, clean it and fill it with lubricant T,
Close the pump purge circuits,
Open the Air motor air valve.