SAMES KREMLIN
Page 7
Manual : 573.005.212
REGULATION STAGE
The gun is filled.
The filling and exhaust valves are closed.
At the end of the filling operation, the piston is at its upper position. The system measures, controls
and regulates the informations : position of the piston, pressure inside the chamber, flow instruction.
EXTRUSION STAGE
The gun is filled.
The filling valve is closed.
The robot controls the extrusion of the seal.
The exhaust valve opens.
The motor, via the ball screw, drives the piston. The material is exhausted to a constant flow (for a
constant instruction).
The REGULEX® piston comes down in the chamber
Dispensing of the bead.
If the REGULEX® gun is fitted with an heating kit :
Start up the control unit that controls the temperature.
Program the temperature regulators :
Instruction temperature.
Low alarm temperature.
High alarm temperature.
Do not prime the REGULEX® gun as long as the fluid is not at the required temperature.
IMPORTANT
During the programming of the trajectory, begin the dispense of the bead where it
will have the most constant diameter.
At the end of the bead :
- Maintain a constant flow at the end of the trajectory,
- Program a null flow at the instant preceding the covering of the bead,
- Then program the closing of the exhaust valve.
WARNING
Before any action on the cables connected to the REGULEX® bay, you must
switch it off.
Содержание REGULEX 107 CC
Страница 27: ...SAMES KREMLIN Page 6 Manual 573 007 212 CONNECTION OF THE HEATED KIT...
Страница 29: ...SAMES KREMLIN 2 Doc Dok 573 275 050...
Страница 39: ...SAMES KREMLIN Page 2 Doc Dok 999 387 500...