![Salvis Master VisionPRO Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/salvis/master-visionpro/master-visionpro_assembly-instructions-manual_804114047.webp)
Assambly instruction Cooking station
6.
Closing the cooking station
.
Install all cover panels on the installation compartments.
6.1
Aligning the operating panels/side panels
Front radius
Top
radius
Side wall
Operating panel
Specifications for final assembled condition
D
The radius of the side panel is fully visible
(front and top).
D
Ensure smallest possible gaps!
Support plate bottom
Elongated holes left and right
Triple attachment for support plate bottom:
- Combination nut M4, art. no. 377740
- Fillister-head screw M4x8,
art. no. 33905
with elongated holes
Inside
view:
Adjustment options side panel top
- Elongated holes left and right
- For adjustment option to top/bottom
Adjustment options side panel bottom
- Elongated holes in support plate bottom
- For front adjustment options (direction of
arrow)
- Release three screws for adjustment
Содержание Master VisionPRO
Страница 71: ...71 72 ...
Страница 72: ...887968 11 12 7 18 SALVIS AG Nordstrasse 15 CH 4665 Oftringen www salvis ch smart cooking ...