background image

  

ENGLISH

  

 

18

 

 

Check

 

point

 

Periodicity

 

State

 

of

 

the

 

auxiliary

 

systems

 

Depends

 

on

 

equipment

 

type.

 

See

 

dedicated

 

equipment

 

IOM

 

Motor

 

See

 

manufacturer

 

IOM

 

Shaft

 

sealing

 

Weekly

 

Leaks

 

from

 

gaskets

 

Weekly

 

Oil

 

level

 

and

 

grease

 

quantities

 

Daily

 

/

 

Weekly

 

/

 

Monthly

 

Lubricants

 

(ball

 

bearings)

 

Replacement

 

frequency

 

according

 

ball

 

bearing

 

type

 

and

 

shaft

 

speed

 

Bearings

 

surface

 

temperature

 

Monthly

 

Cleaning

 

Twice

 

a

 

year

 

Alignment

 

and

 

coupling

 

wear

 

Twice

 

a

 

year

 

Noise,

 

vibrations

 

Monthly

 

Anchoring

 

quality

 

Yearly

 

Those

 

frequencies

 

are

 

given

 

for

 

information

 

only.

 

They

 

could

 

be

 

used

 

as

 

a

 

basis

 

to

 

the

 

creation

 

of

 

a

 

maintenance

 

plan

 

when

 

starting

 

a

 

new

 

installation.

 

Depending

 

on

 

installation

 

conditions

 

and

 

use,

 

the

 

periodicity

 

will

 

be

 

shortened

 

or

 

prolonged.

 

 

9.2.1

 

LUBRICATION

 

 

Close

coupled

 

pumps

 

are

 

equipped

 

with

 

a

 

long

 

shaft

 

motor.

 

Ball

 

bearings

 

are

 

designed

 

for

 

a

 

lifetime

 

L10h

 

of

 

20000

 

hours.

 

 

The

 

pumps

 

equipped

 

with

 

an

 

IEC

 

adaptation

 

lantern

 

(biblock)

 

receive

 

standard

 

IEC

 

air

 

cooled

 

motors.

 

Ball

 

bearings

 

are

 

designed

 

for

 

a

 

lifetime

 

L10h

 

of

 

40000

 

to

 

50000

 

hours

 

depending

 

on

 

motor

 

speed.

 

Pump

 

bearing

 

bracket

 

is

 

equipped

 

with

 

lifetime

 

lubricated

 

ball

 

bearings

 

(L10h

 

=

 

20000

 

hours).

 

 

The

 

bearing

 

brackets

 

of

 

the

 

pump

 

sets

 

assembled

 

on

 

a

 

base

 

frame

 

are

 

equipped

 

with

 

lifetime

 

lubricated

 

ball

 

bearings

 

(L10h

 

=

 

20000

 

hours).

 

Feet

 

mounted

 

motors

 

(IEC

 

frame

 

type

 

B3)

 

are

 

fitted

 

with

 

lifetime

 

lubricated

 

ball

 

bearings

 

or

 

grease

 

lubricated

 

ball

 

bearings.

 

 

9.2.1.1

 

MECHANICAL

 

SEAL

 

S

 

pump

 

are

 

supplied

 

with

 

a

 

quench

 

(grease)

 

except

 

when

 

EPDM

 

shaft

 

seal

 

is

 

used

 

or

 

for

 

thermal

 

engine

 

driven

 

pumps.

 

The

 

self

 

automatic

 

greasing

 

cartridge

 

is

 

delivered

 

with

 

the

 

pump

 

(not

 

mounted).

 

It

 

is

 

filled

 

with

 

mineral

 

based

 

grease

 

with

 

paraffin.

  

Action

 

time

 

will

 

be

 

initially

 

set

 

to

 

12

 

months

 

(see

 

chapter

 

start

up).

 

 

9.2.2

 

VARIANT

 

WITH

 

GALVANIC

 

ANODE

 

:

 

If

 

the

 

«

 

sea

 

water

 

»

 

design

 

was

 

chosen,

 

a

 

sacrificial

 

anode

 

is

 

fastened

 

onto

 

the

 

impeller

 

inspection

 

cover

 

:

 

 

 

Cover

 

fitted

 

with

 

1

 

anode

                                        

Cover

 

fitted

 

with

 

2

 

anodes

 

 

The

 

loss

 

of

 

the

 

anode

 

material

 

should

 

be

 

checked

 

after

 

1

 

month,

 

3

 

months

 

and

 

6

 

months

 

maximum

 

after

 

the

 

pump

 

was

 

filled

 

with

 

sea

 

water.

 

The

 

anode

 

exchange

 

is

 

necessary

 

when

 

it

 

has

 

lost

 

75%

 

in

 

volume

 

:

 

 

Consumed

 

anode.

 

 

Replacement

 

frequency

 

depends

 

on

 

the

 

water

 

chemical

 

composition,

 

its

 

temperature,

 

pH,

 

resistivity,

 

on

 

the

 

way

 

the

 

pump

 

is

 

operated,

 

 

 

9.3

 

DISMANTLING

 

AND

 

RE

ASSEMBLY

 

9.3.1

 

DISMANTLING

 

Make

 

sure

 

that

 

electric

 

power

 

is

 

disconnected

 

and

 

could

 

not

 

be

 

switched

 

on

 

again

 

by

 

fault

 

during

 

maintenance

 

operations.

 

 

Drain

 

the

 

piping

 

at

 

least

 

between

 

the

 

isolating

 

valve

 

installed

 

on

 

the

 

suction

 

and

 

discharge

 

side.

 

 

Remove

 

drain

 

plug

 

and

 

drain

 

the

 

pump

 

casing.

 

 

If

 

necessary

 

disconnect

 

any

 

measuring

 

sensors

 

and

 

gauges.

 

 

Pump

 

casing

 

can

 

be

 

kept

 

fastened

 

to

 

pipe

 

work.

 

 

Remove

 

motor

 

fastening

 

screws

 

and

 

move

 

the

 

motor

 

rearward

 

so

 

that

 

there

 

is

 

enough

 

space

 

to

 

remove

 

the

 

back

 

pull

out

 

assembly.

 

When

 

using

 

a

 

coupling

 

with

 

spacer

 

part,

 

it

 

is

 

not

 

necessary

 

to

 

move

 

the

 

motor

 

rearward.

 

 

Dismantle

 

coupling

 

guard

 

and

 

the

 

half

 

coupling

 

on

 

pump

 

side.

 

 

9.3.1.1

 

DISMANTLING

 

THE

 

MECHANICAL

 

SEAL

 

Cast

 

iron

 

variant

 

:

 

1.

 

Unscrew

 

mechanical

 

seal

 

housing

 

fastening

 

nuts

 

6580

  

2.

 

Remove

 

lantern

 

and

 

impeller

 

rearward.

 

3.

 

Remove

 

casing

 

seal

 

4510.

 

 

Stainless

 

steel

 

variants

 

(split

 

casing

 

design)

 

:

 

1.

 

Unscrew

 

half

 

casing

 

fastening

 

nuts

 

6580

 

2.

 

Remove

 

casing

 

seal

 

4510.

 

3.

 

Remove

 

front

 

wear

 

plate

 

1915

 

and

 

remove

 

the

 

other

 

casing

 

seals.

 

 

Next

 

steps

 

:

 

4.

 

Remove

 

impeller

 

nut

 

2912

 

and

 

washer

 

2911.

 

5.

 

Slide

 

the

 

impeller

 

2200

 

out.

 

6.

 

Remove

 

impeller

 

key

 

6710.

 

7.

 

Slide

 

out

 

rotating

 

part

 

of

 

the

 

mechanical

 

seal

 

4200

 

on

 

the

 

shaft.

 

 

9.3.1.2

 

DISMANTLING

 

THE

 

MECHANICAL

 

SEAL

 

HOUSING

 

Close

 

coupled

 

variants

 

:

 

1.

 

Remove

 

motor

 

fastening

 

screws

 

6570

 

from

 

motor

 

8020.

 

2.

 

Remove

 

mechanical

 

seal

 

housing

 

4211.

 

 

Variant

 

with

 

bearing

 

bracket

 

:

 

1.

 

Remove

 

mechanical

 

seal

 

housing

 

fastening

 

screws

 

6570

 

from

 

housing

 

4011.

 

2.

 

Remove

 

mechanical

 

seal

 

housing

 

4211.

 

Содержание S series

Страница 1: ...S INSTALLATION ET MISE EN SERVICE INSTALLATION AND OPERATING INSTRUCTIONS N M S n 4071640 Ed 5 10 13 FRAN AIS ENGLISH...

Страница 2: ...S INSTALLATION ET MISE EN SERVICE N M S n 4071640 Ed 5 10 13 FRAN AIS...

Страница 3: ...2 9 2 Temp ratures du fluide 6 2 9 3 Risque d accumulation de m langes explosifs 7 2 9 4 Risque de fuites 7 2 9 5 Groupe complet 7 2 9 6 Groupe livr sans moteur sans instrumentation 7 2 9 7 Protecteu...

Страница 4: ...r les effectuer apr s d marrage 16 8 5 Mise hors service 16 8 6 Temps d amor age 16 9 Maintenance 17 9 1 G n ralit s 17 9 2 Programme d entretien et inspections p riodiques 17 9 2 1 Lubrification 17 9...

Страница 5: ...ique m canique chimique thermique etc Dommages mat riels Perte de la protection anti d flagrante Risque de pollution de l environnement 2 4 CONSIGNES DE S CURIT 2 4 1 CONSIGNES DE SECURITE POUR L UTIL...

Страница 6: ...r e sans moteur certificat CE d incorporation fourni avec la pompe il est de la responsabilit de l int grateur de respecter toutes les r gles en vigueur pour pouvoir certifier son quipement CE La cert...

Страница 7: ...tection du moteur lectrique 2 9 6 GROUPE LIVR SANS MOTEUR SANS INSTRUMENTATION Lorsqu un groupe moto pompe fait l objet d une livraison partielle moteur accouplement carter ou capteur non fourni un ce...

Страница 8: ...Prendre les pr cautions n cessaires pour viter tout risque d crasement pendant le d placement des quipements Utiliser un moyen de levage m canique pour soulever tout mat riel dont le poids d passe 25...

Страница 9: ...T4 3 A ZONE 2 CAT 3 II 3G T x B ZONE 2 CAT 3 II 3G EEx d IIB T4 C ZONE 2 CAT 3 II 3G EEx d IIC T4 D ZONE 2 CAT 3 II 3G EEx de IIB T4 E ZONE 2 CAT 3 II 3G EEx de IIC T4 11 X Construction sp ciale Si vo...

Страница 10: ...2400 S91 S121 S161 S201 2000 S180 S230 1600 S170 S220 1200 Nombre de d marrages par heure Attendre l arr t complet du moteur avant de lancer un nouveau d marrage sous peine d endommager moteur et pom...

Страница 11: ...0 88 81 98 S105 1450 83 67 73 S108 2900 86 84 84 S120 1450 78 74 78 S150 1450 84 74 89 S160 1450 81 75 80 S170 950 83 76 77 Niveau sonore indicatif exprim en dBA LpA 1 m 5 2 5 POSITION DES BRIDES L ax...

Страница 12: ...e se visse directement sur le fond porte grain 7 MONTAGE ET RACCORDEMENT ELECTRIQUE 7 1 IMPLANTATION Les quipements devant fonctionner en zone dangereuse classifi e ATEX doivent tre certifi s et r pon...

Страница 13: ...rature anormale des paliers de la pompe et du moteur TEMPERATURE l alignement initial entre la pompe et le moteur est r alis e temp rature ambiante et moteur froid Si la pompe est utilis e sur un flu...

Страница 14: ...alisation de chasse d air est identifi e ATEX Si un clapet anti retour est install au refoulement de la pompe il sera n cessaire d installer un vent ou une purge avec retour vers le r servoir ou la cu...

Страница 15: ...NPSHr de la pompe vitesse minimum est toujours amplement inf rieur au NPSHd de l installation M canique La vitesse minimale ne doit pas descendre en dessous de 40 de la vitesse nominale de la pompe p...

Страница 16: ...ire fonctionner la pompe dans ces conditions au del de quelques secondes Apr s l arr t complet de la pompe toutes les vannes seront ferm es Si la pompe est quip e d un quench r chauffage flushing lubr...

Страница 17: ...iv s Les abords du groupe motopompe doivent tre nettoy s 9 2 PROGRAMME D ENTRETIEN ET INSPECTIONS P RIODIQUES Pour garantir le bon fonctionnement de l quipement et minimiser les risques d al as pendan...

Страница 18: ...9 3 1 2 DEMONTAGE DU FOND PORTE GRAIN Version monobloc 1 D visser les vis 6570 de fixation du moteur 8020 2 D poser le fond porte grain 4211 Version palier 1 D visser les vis 6570 de fixation du porte...

Страница 19: ...semi lastique Le moteur peut tre quip de paliers roulements billes lubrifi s vie 2Z comme de paliers quip s de graisseurs manuels Les graisseurs sont alors visibles au droit des paliers et les quantit...

Страница 20: ...dans la boite bornes du moteur Fuite du corps de pompe de l tanch it d arbre ou de la conduite d aspiration Remplacer le joint de corps Contr ler l tanch it d arbre Contr ler l tat des joints des bri...

Страница 21: ...on de votre commande 12 1 1 PLAN EN COUPE 12 1 2 NOMENCLATURE Rep re D signation 1100 Volute 1139 Bride aspiration 1221 Fond de corps Inox 1230 Trappe de visite 1381 Bride de refoulement 1915 Plaque d...

Страница 22: ...age automatique certaines options ne concernent peut tre pas votre pompe Notre Service Pi ces de Rechange peut confirmer la nomenclature de la pompe gr ce au num ro de s rie disponible sur la plaque s...

Страница 23: ...FRAN AIS 23...

Страница 24: ...24...

Страница 25: ...S INSTALLATION AND OPERATING INSTRUCTIONS N M S n 4071640 Ed 5 10 13 ENGLISH...

Страница 26: ...2...

Страница 27: ...ve atmosphere 6 2 9 1 Specific marking instructions for ATEX 6 2 9 2 Fluid Temperature 6 2 9 3 Build up of explosive mixture 7 2 9 4 Preventing leakage 7 2 9 5 Complete unit 7 2 9 6 Pump unit delivere...

Страница 28: ...3 Start up 16 8 4 Running checks 16 8 5 Shutdown 16 8 6 Priming time 16 9 MAINTENANCE 17 9 1 General information 17 9 2 Maintenance and periodic inspections schedule 17 9 2 1 Lubrication 18 9 2 2 Var...

Страница 29: ...cal and chemical thermal risks Property damages Loss of ex proof protection Risk of environmental pollution 2 4 SAFETY INSTRUCTIONS 2 4 1 SAFETY INSTRUCTIONS FOR THE OPERATOR OPERATION ON THE PUMP SET...

Страница 30: ...sponsibility He will ensure that aIl specifications listed in this instructions are fully respected 2 9 SECURITY INSTRUCTIONS TO BE APPLIED ON EQUIPMENTS USED IN POTENTIALLY EXPLOSIVE ATMOSPHERE This...

Страница 31: ...ents for the complete machine 2 9 7 COUPLING GUARD The coupling guard used in a potentially ATEX atmosphere shall meet following requirements Consist of non sparking material e g brass Must be made of...

Страница 32: ...proper sling length or use a lifting beam Lifting a close coupled or a biblock pump Lifting a pumpset with folded base Lifting a pumpset with cast iron base Lifting a bareshaft pump 4 INTENDED USE S p...

Страница 33: ...l E Cast iron SS 316 Stainless Steel Stainless Steel Z Cast iron zinc anode Bronze or stainless steel Stainless Steel Bronze or stainless steel B Bronze Bronze Stainless Steel Bronze X SS 316 SS 316 S...

Страница 34: ...er than QBEP or if abrasive content is high choose bigger pump size S 63 If flow much higher than QBEP or if abrasive content is high choose bigger pump size S 68 If flow much higher than QBEP or if a...

Страница 35: ...0 2900 88 81 98 S105 1450 83 67 73 S108 2900 86 84 84 S120 1450 78 74 78 S150 1450 84 74 89 S160 1450 81 75 80 S170 950 83 76 77 Indicative noise level given in dBA LpA at 1 m 5 2 5 CONNECTIONS Suctio...

Страница 36: ...Weight of the full lubricator is app 190g and empty app 75g The dispensed product is a special water repellent grease When it is switched on the integrated electronic device regulates grease dispersi...

Страница 37: ...the foundation Use low thickness shims 0 2 to 1 mm to modify coupling alignment Adjust the motor height first Sometimes it is necessary to add shims under pump feet too Aligment of coupling should be...

Страница 38: ...tion flange level When suction pipe is full of liquid the pump is acting like a standard centrifugal pump Priming time will increase if a larger pipe diameter is used or if pipe length is increased An...

Страница 39: ...le and known The electric motor that is supplied with the pump may be connected under conditions to a VSD Variable speed will be used to reach pump required duty point on site To ensure a reliable use...

Страница 40: ...onsumption on each phase of the motor Check calibration of motor protections Check temperature of ball bearings on bearing housing surface Check flexible coupling alignment after several pump starts o...

Страница 41: ...e available near the pump The maintenance crew should be informed about the risks linked to the use of the pump and to the pumped fluids before they can start working on the equipment dangerous produc...

Страница 42: ...ign was chosen a sacrificial anode is fastened onto the impeller inspection cover Cover fitted with 1 anode Cover fitted with 2 anodes The loss of the anode material should be checked after 1 month 3...

Страница 43: ...ng the shaft or the bearing 3 Slide the assembly in the bearing housing 4 Install bearing cover and tighten fastening screws 9 3 2 2 ASSEMBLY OF MECHANICAL SEAL Assembly is performed in the reverse st...

Страница 44: ...ket spanner up to M 48 Allen keys up to 10 mm Range of screwdrivers Soft mallet If maintenance work must be performed in an ATEX classified area then make sure that use of all necessary tools are auth...

Страница 45: ...on pump casing gaskets on shaft sealing or on suction piping Replace casing seal s Check shaft sealing Check the state of the flanges seals Pump is not lifting liquid Air leaks into pump through mech...

Страница 46: ...drawing and bill of material is available upon request The demand should be sent to our Spare parts Dpt and should mention pump description and serial number Data are engraved on the pump name plate a...

Страница 47: ...f packing rings Set of bearing bracket ball bearings Set of shaft bearing Set of motor ball bearings for frame size 90 Complete set of seals and gaskets Coupling elastic part s Automatic greasing cart...

Страница 48: ...24...

Страница 49: ...OUJOURS DISPONIBLE SUR SITE Ce produit a t fabriqu sur un site certifi ISO 14 001 respectueux de l environnement Ce produit est compos de mat riaux en tr s grande partie recyclable En fin de vie le fa...

Отзывы: