background image

16

• 

To take out the beautiful front cover, proceed as follows (see 

figure 4):

 

ˆ

Remove the two fixing screws "C" from beautiful plastic 

front cover.

 

ˆ

Move the front cover to "D" direction, by applying a hard 

and moderated knock on its side (side without screws), to 

free the trim entered into the metallic frame.
The front is free, but still joint to the equipment through 

the connection bus of the control panel.

• 

To put the beautiful front cover back, proceed in the reverse 

way to its removing.

4.2.4.2.  Rotation of control panel with LCD 

panel.

90º

"A"

"B"

"C"

Take out the beautiful front 

cover according to section 

4.2.4.1

Fig. 5. 

Rotation of the control panel with LCD over the beau-

tiful plastic front cover.

• 

To make easier the message reading when the equipment is 

vertically installed, it is advisable to rotate  90º clockwise the 

control panel with LCD (see figure 5).

• 

Also, it is advised to rotate the control panel, if any tower type 

equipment requires to be assembled as rack. Consider that the 

rotation of the control panel will be counter clockwise.

• 

Proceed as follows:

 

ˆ

Remove the beautiful front cover as it is stated in section 

4.2.4.1

 

ˆ

Slightly open the nails of the four trims that hold the con-

trol panel with LCD to the beautiful front cover to free it  

and push inward "A" to separate both parts. 

 

ˆ

Rotate it 90º on clockwise "B" and insert it again into 

the beautiful front cover till click it "C". Check the correct 

closing of the fixing nails.  

 

ˆ

Put the beautiful front cover back, in the reverse way as 

its removing (see section 4.2.4.1). 

4.2.4.3.  Vertical assembling -tower type-.

• 

Rotate the control panel according to section 4.2.4.2.

• 

Take the 4 plastic pieces "A" with angle shape supplied with 

the equipment and joint them two by two till obtain two sup-

ports or stabilizers "B".

• 

Put the UPS vertical between the two stabilizers supports "B" 

(see figure 6).

"A"

"A"

"B"

Fig. 6. 

Vertical -tower type- assembling.

4.2.4.4.  Vertical assembling -tower type- , with 

extended back up time (battery module).

• 

The description of this section is based  on an equipment 

with only one battery module (see figure 7). For a higher 

quantity of modules proceed to the connection among them.

• 

Rotate the control panel of the equipment according to sec-
tion 4.2.4.2.

• 

Take the 4 plastic pieces "A" with angle shape and supplied 

with the UPS and the two supplied with the battery module 

"B", and joint them till obtain two supports or stabilizers "C" to 

hold the equipment and battery module.

• 

Put the UPS and battery module on vertical position between 

the stabilizers supports "C".

• 

Fix the "D" metallic piece that joint UPS and battery module 

by means of the supplied screws "E". 

• 

Regarding the connections of the UPS with the battery module, 

make the following steps, but reading section 4.3.3 previously:

 

ˆ

Connect the supplied earth joint cable "F", between the 

UPS and battery module.

USER MANUAL

Содержание SPS.ADVANCE RT series

Страница 1: ...PLY UPS LIGHTING FLOW DIMMER STABILIZERS ILUEST SWITCH MODE POWER SUPPLY STATIC INVERTERS PHOTOVOLTAIC INVERTERS VOLTAGE STABILIZERS AND POWER LINE CONDITIONERS SPS ADVANCE RT series UNINTERRUPTIBLE P...

Страница 2: ......

Страница 3: ...IEC outlets 4 3 3 Connection of the external batteries extended back up time 4 3 4 Connection of main input earth terminal and the earth bonding terminal 4 3 5 EPO terminals in UPSs 1kVA Emergency Pow...

Страница 4: ...s for safety of the things To not respect such instructions can damage the goods Precaution symbol Read the paragraph text and take the stated preventive mediums it contents the basic in structions an...

Страница 5: ...ive terminal for the load earth connection When an outgoing dis tribution is done i e power strips it is essential that they have an earth terminal connected to each one of them It is essential that t...

Страница 6: ...ven pack aged the equipment will be left for a minimum time of two hours in the new location before making any action with the purpose of adapting it to the new environmental conditions and avoid the...

Страница 7: ...battery cabinet to the equipment respect the cable s polarity and colour red positive black negative indicated in the manual and in the cor responding labelling Wear rubber gloves and shoes Use tools...

Страница 8: ...tive EMC In accordance with the specifications of the harmonized stand ards Standards as reference EN IEC 62040 1 Uninterruptible power supply UPS Part 1 1 General and safety requirements for UPS s us...

Страница 9: ...ment can be checked Act in accordance with the installation Front virew ADVANCE RT Fixing screws Plastic beauty front Fixing screws Plastic beauty front Control panel with LCD Plastic beauty front Fro...

Страница 10: ...AC power supply Earth connection for battery module Output connector with M dem ADSL Fax protection Connector for external EPO Smart slot protection cover Fan IEC outlets LS2 Input connector for modem...

Страница 11: ...of strings in parallel Omitted for one 0 Battery module without them but the needed accessories to install them ADV RT Series of the battery module MOD BAT Battery module i Note relative to the batter...

Страница 12: ...from the batteries through the inverter for a determined time depending on the model battery charge level and the own load connected at the output For models higher than 1000 VA it is possible to inc...

Страница 13: ...olling and management at the manager system dis posal This facility is got through the SNMP adaptor which is well known by the main software and hardware manufacturers The available SNMP option for SP...

Страница 14: ...c isolation transformer as standard as an option or either in stalled by yourself either at the UPS input or output or at all of them protections against indirect contact has to be fitted in residual...

Страница 15: ...als therefore they should be disposed according to current regulations We recom mend to keep the packaging in case its use is necessary in the future Proceed as follows Cut the strips of cardboard enc...

Страница 16: ...wise B and insert it again into the beautiful front cover till click it C Check the correct closing of the fixing nails Put the beautiful front cover back in the reverse way as its removing see sectio...

Страница 17: ...ing with ex tended back up time battery module In the side of each front cover there are the K trims as a notch to go the cables through it with the battery modules Break the needed trims to pass the...

Страница 18: ...igure 9 For higher quantity of modules reproduce the connection procedure among them All models can be installed in a 19 rack cabinet attending the height of each one of them is 2 units Proceed as fol...

Страница 19: ...utlets As this is a device with class I protection against elec tric shocks it is essential to install a protective earth conductor connect earth Connect the conductor to the terminal before connectin...

Страница 20: ...rmally closed NC Less punctual cases it is not recommended to use this type of connection due to the function of the EPO button because it would not work in case of any of the two cables that goes fro...

Страница 21: ...the equipment labelled as Input Connect the own modem ADSL Fax to RJ45 connector of the equipment labelled as Output 4 3 7 Software Free software download WinPower WinPower is a UPS monitoring softwa...

Страница 22: ...part from sensi tive ones are required to be connected like laser printers or CRT monitors keep in mind the start inrush currents of these peripherals in order to avoid that the equipment becomes bloc...

Страница 23: ...from the nominal and takes as a default value the wrong one Check the frequency in the control panel and repeat the procedure if this circumstance would occur 5 2 2 UPS start up with mains present For...

Страница 24: ...on stabilizer mode Blue BATT Warning UPS working on battery mode Blue BTOP Warning Battery disconnected Red TEST Warning UPS working on battery in life function test Blue OPVH Fault Battery mode with...

Страница 25: ...the possible se lectable variables or values Code Description Values OPV Output voltage selection 220 220V 230 230V 240 240V AV Input voltage type 000 Normal range 001 Wide range 002 Gen set EBM Exte...

Страница 26: ...ments stated in table 10 and go forward or backward till reaching EBM 3 Validate the configuration element When the LCD panel displays EBM press the key for more than one second to enter into the elem...

Страница 27: ...the battery and earth termi nals Even with the input circuit breaker switch from protection panel is turned off the internal parts of the UPS are still con nected to the batteries so there are hazardo...

Страница 28: ...company is not forced by the warranty if it appreciates that the defect in the product doesn t exist or it was caused by a wrong use negligence installation and or inadequate testing tentative of repa...

Страница 29: ...reventive and corrective maintenance contracts is pos sible to determine the intervention timetable and response times as well as exclusion or inclusion parts in partial or total way with the purpose...

Страница 30: ...r kVA 0 750 1 1 5 2 3 Power kVW 0 675 0 900 1 350 1 8 2 7 Wave shape Pure sinewave Nominal voltage 220 230 240 V AC selectable Voltage accuracy battery mode 5 Voltage THD linear load 10 3 Voltage THD...

Страница 31: ...l loads always flow in the same direction from the highest potential point to the lowest one Although usually the direct current is identified with the constant cur rent for example the one supplied b...

Страница 32: ...agni tude and frequency by the user or the designer Rectifier In electronic a rectifier is the element or circuit that allows to convert the alternating current into direct cur rent This is done by re...

Страница 33: ...33 SALICRU...

Страница 34: ...34 USER MANUAL...

Страница 35: ...35 SALICRU...

Страница 36: ...NCIA VALLADOLID ZARAGOZA BRANCHES AND SERVICES AND TECHNICAL SUPPORT S T S CHINA FRANCIA HUNGR A MARRUECOS M XICO PORTUGAL REINO UNIDO SINGAPUR SUBSIDIARIES ALEMANIA ARABIA SAUD ARGELIA ARGENTINA B LG...

Отзывы: