5. INSTALLATION.
•
Read and respect the Safety Information, described in
section 2 of this document. To obviate some of the indi-
cations stated in it, can cause a serious or very serious injuries
to persons in direct contact or in the vicinity, as well as break-
downs in the equipment and/or loads connected to itself.
As well as the own user's manual of the equipment, other
annex documents are supplied in the documentation CD. Con-
sult them and follow the described procedure strictly.
•
Unless the opposite is indicated, any action, indications, prem-
ises, notes and others, are applicable to
SLC CUBE3+
equip-
ments, that belong or not to a parallel system.
5.1.
RECEPTION OF THE EQUIPMENT.
•
It is dangerous to handle the equipment over the pallet
with not much prudent, because it could overturn and
cause serious or very serious injuries to the operators due to
impact of the possible fall and/or trapping. Regarding the equip-
ment handling, moving and location pay attention to section 1.2.1.
from safety instructions -EK266*08-.
•
Use the most suitable medium to move the UPS meanwhile is
packaged, with a pallet truck or fork lifting.
•
Any equipment handling will be done paying attention to the
weights according to the model stated in the technical specifi-
cations of section «9. Annexes».
5.1.1.
Reception, packaging and contents.
•
Reception. To check:
Data in the label sticked in the packaging corresponds to
the ones stated in the purchase order. Once the UPS is un-
packed, check the previous data with the one in the name-
plate of the equipment, sticked at the back of the front door
(PF)
.
If discrepancies exist, make the nonconformity as soon as
possible, by quoting the serial number of the equipment and
the references of the delivery note.
No incident has happened during the transport (packaging
and impact indicator are in perfect status).
Otherwise, follow the protocol stated in the label attached
to the impact indicator, located to the packaging.
•
Unpacking.
To check the contents the packaging must be removed.
Complete the unpacking according to the «Un-
packing» procedure of the supplied document to-
gether with this manual and/or attached to the CD.
•
Contents.
Standard equipment up to 20 kVA (LV) / 40 kVA (HV): Docu-
mentation CD and battery fuses.
Standard equipment > 20 kVA (LV) / 40 kVA (HV) or type
B1: Documentation CD.
Equipment 0 /: Documentation CD, wires and needed sup-
ports to fit the batteries in, hardcopy circuit diagram and
battery fuses (equipments up to 20 kVA (LV) / 40 kVA (HV)
only).
Battery cabinet: Fuses and cable connection bundle of 3,5
m. length and suitable cross section.
If the UPS belongs to a parallel system: A communication
BUS bundle per equipment.
•
Once the reception is finished, it is advisable to pack the UPS
again till its commissioning in order to protect it against mechan-
ical impacts, dust, dirt, etc.
•
The packaging of the equipment has a cardboard pallet or
wooden type depending on the case, expanded polystyrene
corners, bag and polyethylene strip, all of them are recyclable
materials. When it is required to dispose them, do it in accord-
ance to the regulation in force.
It is advisable to keep the packaging for 1 year as minimum.
5.1.2. Storage.
•
The storage of the equipment, will be done in a dry and cool place,
and protected from rain, dust, water jets or chemical agents. It
is advisable to keep each equipment and battery set, inside their
original packaging because they have been designed to assure
the maximum protection during transport ant storage.
Fecha carga /
Fecha recarga /
Charging date :
Recharging date:
DY933B00 - 401AF000001
BACK MA
TERIAL
MUY IMPORTANTE PARA LA VIDA DE LAS BATERÍAS DE Pb-Ca:
Para evitar
su degradación deben ser recargadas en los intervalos indicados. Respetar
el procedimiento referido en el manual de usuario del equipo.
VERY IMPORTANT FOR THE LIFETIME OF Pb-Ca BATTERIES:
In order to avoid
their degradation, they must be recharged according to the stated interval
times. Respect the procedure referred in the equipment user’s manual.
0 - 20
12
21 - 30
9
31 - 40
5
41 - 50
2,5
Meses /
Months
ºC
Charging date written down by the factory.
Space to write down the new recharge date.
**-**-****
Data label corresponding to the mod
Fig. 29.
Label sticked in the packaging.
•
In general and less some particular cases,the UPS has
sealed lead-acid batteries. In order to avoid its deteriora-
tion during the storage, they must be recharged in the stated
period of time according to the temperature that they are ex-
posed (see last charge written down in the labelling sticked in the
equipment packaging or in the battery module, see Fig. 29).
•
Lapsed this period of time, connect the equipment to mains to-
gether with the battery set if any, paying attention to the safety
instructions and connection.
Models with separate static bypass line, is not needed to
connect this power terminal strip.
Proceed to start it up as it is described in section 6, do not