- 16 -
4.- INSTALLATION.
4.1.- Important safety instructions.
• Check the "Safety instructions" (see document EK266*08).
• Check all the data in the nameplate corresponds with the required in the installation.
• Both
ILUEST
versions have 4 drills for their fixing to a solid and levelled base, for equipment immobilizing purposes. It is needed
to make this mechanical operation before proceeding with the installation.
• The location will be cooled and with easy access and in case of the indoor version
(T)
,
will never
be outdoors. For this version
will be kept in mind the following declaration.
Important
:
The enclosures like the distribution boards, must have cooling openings for the
ILUEST
, without affecting to its
protection degree standard compliance.
• The cooling holes will never be blocked.
• The input switch
(4)
or switches
(4), (5)
, and
(6)
of the equipment must be turned "Off" or "0".
• It is necessary to remove the screws
(t)
which are fixing the cover
(a)
of the version
(T)
or to open the door
(b)
through the
lock
(c)
in the version
(I)
to have access to
ILUEST
the terminals .
• The equipments have two cable glands, located at the bottom of the enclosure to enter the connecting cables in. Never make
this previous operation, neither the connection to the
ILUEST
terminals, with electrical mains present.
• The input, output and earth cross section cables will be sized according to the nominal current stated in the nameplate, and
according with the Local Low Voltage Regulations.
• The
ILUEST
connection will be done at the head of the feeder pillar. As an example, in the figure 12 it is showed the location
in a three-phase installation.
• In case it is needed to install an external manual bypass, follow the following recommendations:
The bypass must avoid connecting voltage to the output of the equipment. Either to avoid damages to the equipment (the
equipment is not protected from voltage backfeeds at its output) or to manipulate the output terminals of the equipment
without voltage and no risk. Therefore, the Bypass must disconnect the output of the equipment in the instant that it is
connected. The best option is to install a two positions rotary switch with connected as follows: common contact connected
to the loads, one contact to the output of the equipment and the other contact to the reserve line in case of fault.
Therefore, the best option is a rotary switch with two positions and double circuit.
4.2.- Equipment reception.
4.2.1.- Unpacking and contents checking.
For the correct equipment unpacking, see figures from 4 to 9 and act in consequence. Although the pictures show an outdoor
equipment
(I)
, proceed in the same way with the indoor version
(T)
.
• During the equipment reception, check that it has not been damaged during its transport. If it is damaged, make all suitable
claims to your supplier or, short of this, to our firm. Also check if the data of the nameplate sticked to the equipment package
corresponds to those specified in the order. If it is not being in this way, please make the claim as soon as possible, by
mentioning the serial number of the equipment and the references of the delivery invoice.
Содержание ILUEST NE Series
Страница 2: ...2...
Страница 31: ...31...
Страница 59: ...59...
Страница 60: ...08460 Palautordera Tel 34 93 848 24 00 sat salicru com salicru com...