User Manual
38
User Manual
Grid Compliance:(only for SAJ or SAJ representative)
Different country has different grid connection standard for inverter. The grid compliance of
the inverter can be changed by this setting menu when the inverter is run for the first time or the
country selection is wrong.
Enter the Grid Compliance submenu and confirm the password, then the country which the
inverter installed in can be selected. After the selection, press ‘ ’ to move the focus to button
‘OK’, then press ‘Enter’.
Clear Errors:
After entering the Clear Errors submenu, the LCD will display as below. The operation by
moving the focus to button ‘OK and pressing ‘Enter’ will delete the error record saved in the
inverter permanently. If you want to exit, press ‘ ’ to move the focus to button ‘Cancel’ and
press ‘Enter’
Figure 6.9 Clear Errors operation Screen
Clear Energy:
After entering the Clear Energy submenu, the LCD will display as Figure 6.10. The operation by
moving the focus to button ‘OK and pressing ‘Enter’ will delete the energy yield data saved in
the inverter permanently. If you want to exit, press ‘ ’ to move focus to button ‘Cancel’ and
press ‘Enter’