User Manual
24
User Manual
6)Wrest the cap by using the torque of 2.6~2.9N·m.
7)After wrested the cap tightly, align the 2 half connectors and mate them together by hand until
a “click” is heard or felt.
8)Connect the positive and negative terminals from the PV panels to positive and negative
terminals on the PV inverter.
Note: In order to seal the inverter, all DC inputs that are not required have to be closed.