SAJ M2 Series Скачать руководство пользователя страница 22

   

                                                                                                                                                                                                                                                                                                                                                                      

 M2 Series Micro-inverter

 

37 

38 

 

Code 

Fault Information 

Troubleshooting 

Please check whether the AC and DC cables are damaged, whether they are 
soaked in water, and whether the battery board is soaked in water.  
After the above checks are confirmed, please close the AC switch and restart 
the inverter. 
If this fault appears continuously, please contact the SAJ service. 

10 

Output Current Dci High 

Disconnect the AC switch for 5 minutes and then restart the inverter.  
If this fault appears continuously, please contact the SAJ service. 

12 

Master HW Inv Current High 

Disconnect the AC switch and check whether the AC cable is firmly connected; 
After the above checks are confirmed, please close the AC switch and restart 
the inverter. 
If this fault appears continuously, please contact the SAJ service. 

13 

Master SW Inv Current High 

14 

Grid Voltage 10Min High 

Please check whether the grid voltage is too high, whether the AC output cable 
of the inverter is connected firmly and whether the grid-connected cable is too 
thin.  
Please check whether the grid-connected safety regulations of the inverter are 
selected correctly. 
If this fault appears continuously, please contact the SAJ service. 

15 

Grid Voltage High 

16 

Grid Voltage Low 

Please check whether the grid voltage is too low.  
Please check whether the AC output cable of the inverter is firmly connected.  
Please check whether the grid-connected safety regulations of the inverter are 
selected correctly. 
If this fault appears continuously, please contact the SAJ service. 

17 

Master Grid Frequency High 

Please check whether the grid-connected safety regulations of the inverter are 
selected correctly.  
After disconnecting the AC switch for 5 minutes, close the AC switch and restart 
the inverter. 
If this fault appears continuously, please contact the SAJ service. 

18 

Master Grid Frequency Low 

Please check whether the grid-connected safety regulations of the inverter are 
selected correctly.  
After disconnecting the AC switch for 5 minutes, close the AC switch and restart 
the inverter. 
If this fault appears continuously, please contact the SAJ service. 

Code 

Fault Information 

Troubleshooting 

19 

Master No Grid Error 

Please confirm whether the power grid is powered off, whether the grid-
connected box switch is tripped, and whether the AC cable of the inverter is 
connected firmly.  
After the above inspections confirm that there is no power failure or 
disconnection, or insecure connection, please close the AC switch and re-
connect to the grid, 
If this fault appears continuously, please contact the SAJ service. 

20 

Master PV1 Voltage High Error 

Please check whether the open-circuit voltage of each battery panel exceeds 
the maximum input voltage of the inverter.  
After the above checks are confirmed, please close the AC switch and restart 
the inverter. 
If this fault appears continuously, please contact the SAJ service. 

21 

Master PV2 Voltage High Error 

22 

Master PV3 Voltage High Error 

23 

Master PV4 Voltage High Error 

24 

Master HW PV1 Current High 

Please check whether the positive and negative poles of the battery board are 
reversed.  
After the above checks are confirmed, please close the AC switch and restart 
the inverter. 
If this fault appears continuously, please contact the SAJ service. 

25 

Master SW PV1 Current High 

26 

Master HW PV2 Current High 

27 

Master SW PV2 Current High 

28 

Master HW PV3 Current High 

29 

Master SW PV3 Current High 

30 

Master HW PV4 Current High 

31 

Master SW PV4 Current High 

Содержание M2 Series

Страница 1: ...www saj electric com Add SAJ Innovation Park No 9 Lizhishan Road Science City Guangzhou High tech Zone Guangdong P R China GUANGZHOU SANJING ELECTRIC CO LTD M2 Series MICRO INVERTER USER MANUAL M2 1 8...

Страница 2: ...ble shooting and safety Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service Customer orientation is our forever commitmen...

Страница 3: ...re 14 3 4 1 Installation Tools 15 3 4 2 Mounting Procedures 16 Chapter 4 Electrical Connection 17 4 1 Safety Instruction 18 4 2 Specifications for Electrical Interface 18 4 3 AC Side Cable Connection...

Страница 4: ...in death or serious injury WARNING WARNING indicates a hazardous situation which if not avoided can result in death or serious injury or moderate injury CAUTION CAUTION indicates a hazardous condition...

Страница 5: ...nnel who have full knowledge of local safety regulations and local standards on batteries can install maintain retrieve and process this product SAJ Electric shall not be liable for any loss or warran...

Страница 6: ...DC electricity generated by solar panels into AC electricity which is in accordance with the requirements of the public grid and sends the AC into the grid reducing the load pressure of the grid Figu...

Страница 7: ...le Power STC Range Wp 400 700 Peak Power Tracking Voltage V 35 50 Operating Voltage Range V 16 55 Maximum Input Voltage V 60 Maximum Input Current A 20 x 4 Back Feed Current A 0 Overvoltage Category O...

Страница 8: ...o 60 45 to 60 with derating Communication Wi Fi Bluetooth Cooling Method Natural Convection Ambient Humidity 0 100 non condensing Altitude 2000m Noise dBA 20 Ingress Protection IP67 Dimensions W x H x...

Страница 9: ...ons 3 2 Pre installation Check 3 2 1 Check the package Although SAJ s inverters have thoroughly tested and checked before delivery it is uncertain that the inverters may suffer damages during transpor...

Страница 10: ...e consider the solidity of the wall or the rail including accessories Make sure the wall or the rail has enough strength to hold the screws and bear the weight of products Please ensure the mounting b...

Страница 11: ...tective gloves Dust mask Earplugs Goggles Insulated shoes Heat shrink tubing Heat gun Hammer drill Drill bit 10 Rubber mallet Phillips screwdriver Wrench 3 4 2 Mounting Procedures Step 1 Plan and inst...

Страница 12: ...cians in accordance with local and national electrical standards and regulations WARNING When the photovoltaic array is exposed to light it supplies a DC voltage to the inverter Ensure that all AC cab...

Страница 13: ...nes to port L and port N Figure 4 3 Split phase power grid 2 If the micro inverter is connected to 230 400V three phase WYE power grid connect the live line to port L and connect the neutral line to p...

Страница 14: ...tor wiring For multi machine system prepare and install AC cables Use AC cables to connect the microinverters to the distribution box 1 Use the AC trunk connector unlock tool to align the slot on the...

Страница 15: ...and then connect it to the local power grid 3 If there is an empty port on the bus box please insert the main cable protective cover into the empty port to ensure that the connector is dust proof and...

Страница 16: ...s Figure 4 19 Multi machine PV connection Grid Figure 4 20 Single machine PV connection NOTICE If there are more than one installation site please make the installation map separately and give a clear...

Страница 17: ...at start up The definition of LED is shown as below Status Indicates Green Solid Working normally Green Breathing Standby Waiting Red Flashing 1 Unable to connect Red Solid Fault Red Breathing Upgrad...

Страница 18: ...r first a Click Register Choose whether you are an owner or an installer or distributor b Follow the instructions on the screen to complete the registration 4 Use the account and password to log in to...

Страница 19: ...then click on Next Step 3 Select your device and click WiFi Configuration Step 4 Select your WiFi and enter the WiFi passwords then choose your correct router Step 5 Click the right arrow of your devi...

Страница 20: ...r Me Step 2 Fill in the inverter SN click the button to read the device information then click Next Step 3 Fill in the plant basic information and then enter the Plant list page Step 4 Click on the pl...

Страница 21: ...inverter If this fault appears continuously please contact the SAJ service 5 Frequency Config Error Please check whether the safety regulations are selected correctly Disconnecting the AC and DC switc...

Страница 22: ...e selected correctly After disconnecting the AC switch for 5 minutes close the AC switch and restart the inverter If this fault appears continuously please contact the SAJ service 18 Master Grid Frequ...

Страница 23: ...ling facility in your area Contact SAJ Guangzhou Sanjing Electric Co Ltd SAJ Innovation Park No 9 Lizhishan Road Guangzhou Science City Guangdong P R China Postcode 510663 Web http www saj electric co...

Отзывы: