VERS. 2022.10.14
CWT 315_MAN_EN
17
4 - HANDLING AND INSTALLATION
4.1 TRANSPORTATION BY TRUCK
Due to its particularly sturdy monolithic structure, the machine can be easily
transported without any disassembly operations; however, it is important to pay
attention to the following rules:
–
make sure that the lifting ropes are correctly hooked to the four lifting eyes;
–
We recommend avoiding shocks or sudden shocks both in the lifting phase and in
the support phase of the structure;
–
in the case of long journeys with routes that are not necessarily straight, it is very
important to tie the structure well to the means of transport, because the center of
gravity is very high and accidents can occur due to speed both when cornering and
on bumps or slopes;
–
all machines are equipped with special lifting hooks, so please use them in order
to avoid inconveniences.
4.2 LOADING UNLOADING AND HANDLING
The machine must be transported leaving it resting on the feet on a level surface.
The movement is carried out by lifting it from the crossbeams of the bench, then
placing it gently on the ground, without knocks.
Or by lifting it by means of a harness with special textile straps for lifting (Fig. 2)
Fig. 2
IMPORTANT:
Lift the machine by hooking it to all four lifting
eyes, so that the load is balanced.
Содержание Norton Clipper CWT 315
Страница 1: ...CWT 315 OPERATING INSTRUCTIONS Translation of the original instructions...
Страница 2: ...VERS 2022 10 14 CWT 315_MAN_EN 2...
Страница 35: ...VERS 2022 10 14 CWT 315_MAN_EN 35...
Страница 36: ...VERS 2022 10 14 CWT 315_MAN_EN 36...