Installation check list: Functional test in harbor
7-6
Chapter 7: Installation check
98-137654-A
7.4
Installation check list: Functional
test in harbor
Step
Task
Further information
Done
1.
Check that the antenna is
tracking the satellite
The TV ready LED in the ACU
display must be steady green and
the display shows:
TRACKING
.
In the web interface and in the
Control Panel check:
DASHBOARD:
System status: Tracking
2.
Connect TV distribution
equipment, see the
installation instruction of the
TV distribution equipment
manufacturer.
Check for TV reception.
Table 7-4: Installation check list: Functional test in harbour
SAILOR100TM.book Page 6 Tuesday, January 29, 2013 2:44 PM
Содержание 100
Страница 1: ...TRAINING INSTALLATION SERVICE MANUAL SAILOR 100 Satellite TV ...
Страница 2: ......
Страница 13: ...Table of contents 98 137654 A xi SAILOR100TM book Page xi Tuesday January 29 2013 2 44 PM ...
Страница 14: ...Table of contents xii 98 137654 A SAILOR100TM book Page xii Tuesday January 29 2013 2 44 PM ...
Страница 78: ...Power up 5 8 Chapter 5 Connecting power 98 137654 A SAILOR100TM book Page 8 Tuesday January 29 2013 2 44 PM ...
Страница 215: ...Appendices SAILOR100TM book Page 1 Tuesday January 29 2013 2 44 PM ...
Страница 216: ...SAILOR100TM book Page 2 Tuesday January 29 2013 2 44 PM ...
Страница 250: ...List of ACU events C 10 Appendix C System messages 98 137654 A SAILOR100TM book Page 10 Tuesday January 29 2013 2 44 PM ...
Страница 254: ...Glossary Glossary 4 98 137654 A SAILOR100TM book Page 4 Tuesday January 29 2013 2 44 PM ...
Страница 261: ......
Страница 262: ...info thrane com thrane com 98 137654 A ...