10
OPERATING YOUR NEW APPLIANCE
WARNING
Both the STEAM LEVER and
HOT WATER dial must be in the
CLOSED position for the machine to
enter START UP mode.
BEFORE FIRST USE
Machine Preparation
Remove and discard all labelling and
packaging materials attached to your
espresso machine. Ensure you have
removed all parts and accessories before
discarding the packaging.
Clean parts and accessories (water tank,
portafilter, filter baskets, jug) using warm
water and a gentle dish washing liquid and
rinse well.
Conditioning the Water Filter
•
Remove filter from the plastic bag and
soak in a cup of water for 5 minutes.
•
Rinse filter under cold running water.
•
Wash the stainless steel mesh in
the plastic filter compartment with
cold water.
•
Insert the filter into the filter holder.
•
Set Date Dial 2 months ahead.
•
To install filter, push down to lock
into place.
•
Slide the water tank into position and
lock into place.
NOTE
To purchase water filters visit
sageappliances.com.
FIRST USE
Initial Start Up
•
Fill tank with cold tap water.
•
Dip Water Hardness Test Strip into
water tank for 1 second & set aside.
•
Check Steam Lever and Hot Water dial
are in the CLOSED position.
•
Press POWER On.
•
A pumping sound will be heard
indicating empty boilers are being
filled with water for the first time.
•
Machine will prompt you to set water
hardness. Refer for test strip for your
water hardness. Use the Arrow UP or
Arrow DOWN keys to select water
hardness 1–5. Press Menu to set.
Machine will beep to confirm selection.
•
Machine will reach operating temperature
and go into STANDBY mode.
Flushing The Machine
When the machine has reached STANDBY
mode, run the following 3 steps:
1.
Press 2 Cup button to run water
through group head.
2.
Run Hot Water for 30 seconds.
3.
Activate Steam for 10 seconds.
TIP
You can manoeuvre your machine
about the bench using the drop down
swivel foot located under the drip tray.
Содержание the Dual Boiler BES920
Страница 1: ...BES920 the Dual Boiler Instruction Booklet...