Ev5:
Sizing is correct?
Ev6:
∆V ≤ 2V
a
?
Ev7:
Node ID# set?
Ev8:
Terminal torque OK?
Ev9:
Op. LED’s state
b
?
Installation Date
#
a
This check is required if more than one Evolion
®
will be installed and operated on one bus.
b
See Table 3
INSTALLATION NOTES:
Module Label:
Installation Checklist:
Evolion
®
3.9 kWh
Historical Data Sheet
P/N
S/N
Manufacturing Date
Software Version
Parameters Version
Date
Initials
Node ID#
a
RS_speed
b
Factorized IMR
b
Parameter (btr)
b
BMST upgrade
b
a
See Figure 6 or use the Evolion
®
Toolbox Software.
b
Use the Evolion
®
Toolbox Software.
Ev1: All items received (Table 1)?
Ev3: Use Figure 4 and log the following information:
Month Date
Op. LED state
(Table 3)
Terminal Voltage
(xx.x)
SOC LED state
(Table 2)
SOH LED state
(Table 2)
1
2
3
4
5
6
7
8
9
10
11
12
Receiving and Storage: