
Return to Table of Contents
Ref: SafetyLink Pty Ltd Permanent Ladder System
Page 13 of 36
Doc ID: MKT-471 Version: 19.0
LADDER INSTALLATION STEPS
6.
Install top mounting bracket within top three (3)
rungs and aligned with suitable building
structure. Do not install into rungs.
7.
Install additional brackets to ladders no further
than 2.4 metres apart and within two (2) rungs of
ladder joins.
8.
Place assembled ladder against structure and
install brackets to structure able to support 3kN
for ladders without vertical lifeline and 15kN for
ladders with vertical lifeline.
9.
Bolt entry platform if required to base of ladder.
Level with adjustable leg kit and fix off.
10.
Bolt top platform to ladder head and level with adjustable leg kit or parapet platform kit.
11.
Attach top handrail kit to ladder styles.
90 DEGREES
75 DEGREES