6
OBSERVER 4100 USER GUIDE
Lock Box (Part #SV-4100LB)
Use the following procedure to install the
Observer 4100 in the SV-4100LB Lock Box::
1.
Open the front door.
2.
Use a T15 security bit to remove the
screw centered underneath the door
hinge.
3.
Push the lid to the rear and lift it up to
remove it.
4.
Mount the lock box to a flat surface using
secure mounting hardware through the
six open holes in the bottom of the lock
box (three near the front, three near the
rear).
5.
Ensure the power and ground leads for
the auxiliary fan are threaded through
the cable passage in the rear.
6.
Attach the power and ground leads to
the +12V and GND terminals respectively
on the Observer 4100 terminal block.
(The terminal block remains on the
outside of the lock box.)
7.
Thread all cables that will be connected
to the Observer 4100 through the
cable passage and connect them to the
Observer 4100.
It is easier to attach cables to the back of the
Observer 4100 before it is secured in the lock
box.
Содержание OBSERVER 4100
Страница 1: ...OBSERVER 4100 USER GUIDE...
Страница 10: ...8 OBSERVER 4100 USER GUIDE CP3 Monitor CP4 Monitor...
Страница 52: ...50 OBSERVER 4100 USER GUIDE...
Страница 61: ...OBSERVER 4100 USER GUIDE 59...