DOCUMENT NO: M40 ISSUE NO: 3 ISSUE DATE: 11/07/18
9
OPERATING INSTRUCTIONS
(ENSURE THE UNIT IS PLUGGED IN TO THE MAINS ELECTRICAL SUPPLY)
1.
Before switching on the unit, check that the main filter is fitted (the filter
identification label will be visible through the filter viewing window on the upper
fascia panel.
2.
Switch on at the mains socket and at the green ON/OFF switch on the cupboard
and allow it to run for approximately 10 minutes prior to use.
3.
Always use appropriate PPE (personal protection equipment) when using the
Airone FC750 Fume Cupboard.
4.
Assess the potential hazard of the intended procedure before commencing work.
The hazard level can be reduced by:
Working with a reduced height of sash opening.
Using reduced quantities of substances involved.
Lowering reaction rates where acceptable.
5.
When working in the cupboard, ensure that the hinged acrylic front window is in
the closed position, in order to achieve containment at 0.4M/sec and always keep
closed when the fume cupboard is not in use.
6.
If using Bunsen burners, place them at least 20cm from the front sash, sides or
rear baffle.
7.
For access to the inside of the fume cupboard for loading apparatus or cleaning,
the hinged lower front acrylic panel, can be fully open and will be held in position
by the two black detent hinges.
NOTE
The hinges will only hold the lower front panel in
the fully open position, when opening make sure
that they click into the fully open position.
!