
7
Step by step installation guide
The Top and Bottom Locks are marked A and B
on the back. Slide A into the end marked A, and
B into the end marked B on the Fast Mount™
Locking Rail (E1) until they both snap into pla-
ce. The end with the A’s is the top of your Rail.
The Top and Bottom Hinges are marked C and
D on the back. Slide C into the end marked
C, and D into the end marked D on the Fast
Mount™ Hinge Rail (E2) until they both snap
into place. The end with the C’s is the top of
your Rail.
Insert a screwdriver into the small hole at the
back of the Bottom Lock/Hinge, push hard both
in and down.
Slide the curved section out of the Bottom
Lock/Hinge.
Optional:
If you have wires, pipes or beading (max diameter
15 mm
)
along the base of the wall
UK