4
©2018 SAFARI Montage All Rights Reserved
Step 4 – Hard Disk Drive Installation
Using the diagram and tables below, insert the received drives in the appropriate drive bays of the
coresponding server model. Be sure the sled latch clicks into place, ensuring proper drive seating.
WAN-1220 | WAN-1212
RM-810 | RM-86
WAN-1220 | WAN-1212
RM-810 | RM-86
Drive
Server Location
Drive
Server Location
OS-1
Drive Bay 0
OS-1
Drive Bay 0
OS-2
Drive Bay 1
Content-1
Drive Bay 1
Content-1
Drive Bay 2
Content-2
Drive Bay 2
Content-2
Drive Bay 3
Content-3
Drive Bay 3
Content-3
Drive Bay 4
Content-4
Drive Bay 4
Content-4
Drive Bay 5
Content-5
Drive Bay 5
Content-5
Drive Bay 6
Content-6
Drive Bay 6
Content-6
Drive Bay 7
Content-7
Drive Bay 7
Content-7
Drive Bay 8
Content-8
Drive Bay 9
Content-9
Drive Bay 10
Content-10
Drive Bay 11