20
XL-MS196 Rev E · 2019-04-30 · Amendments and Errors Reserved · © SAF-HOLLAND, Inc., SAF-HOLLAND, HOLLAND, SAF,
and logos are trademarks of SAF-HOLLAND S.A., SAF-HOLLAND GmbH, and SAF-HOLLAND, Inc.
Component Replacement Instructions
12. Pre-Operation Checklist
Prior to placing the unit in service, check the following items:
Failure to properly secure vehicle prior
to commencing work could create a roll
and/or crush hazard which, if not avoided,
could result in death or serious injury.
1. Check the trunnion clamp welding to the frame bracket
for proper welding
(Figure 13
, page 16
)
.
2. Ensure that the frame bracket bracing is in place and
properly welded
(Figure 4
, page 17
)
.
3. Check the axle connection welding
(Figure 18)
.
Welding MUST be in accordance with NS-65-28 for
TS models or NS-65-30 for USR models. For all models
welding MUST be in accordance with NS-65-07.
4. Ensure that all nuts have been torqued to specifications.
in
Table 1
, Page 21.
Figure 18
Figure 19
Figure 20
SPRING
SPRING
NO WELD
ON U-BOLT
AXLE SPACING (AXLE
MUST BE EQUIDISTANT
AT BOTH ENDS)
5" DIAMETER AXLES
5-3/4" DIAMETER AXLES
5" DIAMETER
AXLE
AXLE CAMBER LINE
CLEARANCE FOR
AXLE ALIGNMENT
WELD PER HOLLAND
®
USA
ENGINEERING STANDARD
NS-65-28/NS-65-30 AFTER
AXLE ALIGNMENT
5" DIAMETER
AXLE U-BOLTS
(USE INNER HOLES)
5" DIAMETER
AXLE U-BOLTS
(USE INNER HOLES)
5-3/4" DIAMETER AXLE
EQUAL DISTANT AT BOTH ENDS
SPRING END CAP
SPACER
SPRING END PAD
BRAKE FLANGE
3/4"
AXLE CAMBER LINE
U-BOLT