18
XL-TG10153BM-en-US Rev A · 2013-06-27 · Amendments and Errors Reserved · © SAF-HOLLAND, Inc., SAF-HOLLAND, HOLLAND, SAF,
and logos are trademarks of SAF-HOLLAND S.A., SAF-HOLLAND GmbH, and SAF-HOLLAND, Inc.
Figure 29
Figure 30
10. Toggle Installation
NOTE:
Verify the vehicle power supply is disconnected
prior to installing the toggle.
1. Position the toggle in a location that is accessible from
the ground and deck level.
2. Run and secure the control station cable under the
vehicle chassis to the pump box.
3. Feed the control station cable through the strain relief
on the back of the pump box
(Figure 29)
.
4. Connect the green wire from the control station cable to
the power side terminal of the pump solenoid
(Figure 28).
5. Connect the white wire from the control station cable
to the coil with white wire from the diode harness
(Figure 30)
.
6. Connect the black wire from the control station cable to the
coil with black wire from the diode harness
(Figure 30)
.
7. Coil the excess control station cable inside the pump box.
WHITE WIRE
FROM CONTROL
STATION (UP)
DIODE HARNESS
WHITE WIRE (UP)
BLACK WIRE
FROM CONTROL
STATION (DOWN)
DIODE HARNESS
BLACK WIRE (DOWN)
GREEN WIRE FROM
CONTROL STATION
(POWER SIDE)
GROMMET
Toggle Installation