Saeco Xsmall Plus Скачать руководство пользователя страница 19

Saeco Int. 

Rev. 00 / Jul. 2008 

Page 3 / 6

XSMALL 

04 OPERATING LOGIC

 

 

4.3. 

Coffee cycle operating diagram

Main switch 

ON

START

STOP

Time

Coffee grinder

Heating

Pump

Brewing unit 

gear motor 

Status

Heating

Ready

Coffee cycle

approx. 

45 secs.

Pulses 

(Dosage)

Pump operation (tur-

bine pulses) in accord-

ance with the amount 

of product selected.

*

Notes: * Only with Pre-brewing

MS status

OFF

Single microswitch gear motor

ON

Switching on

 When the machine is switched on, the gear motor repositions itself as follows:

 -  It acts on microswitch 1 (see following section).

 -  The gear motor changes its rotation direction and moves upwards again by approx. 1-2 mm.

 -  The boiler begins to heat water for approx. 45 seconds. It absorbs all the available heating 

power in order to reach the optimal temperature. The temperature will then remain at a con-

stant level. 

 Coffee cycle

 The coffee grinder starts the grinding process (controlled by pulses generated by a sensor).

1. 

 The gear motor (brewing unit) moves to the dispensing position.

2. 

 Preliminary dispensing phase (short pump activity, short pause).

3. 

 Product dispensing (the pump operation period is de

fi

 ned by the amount of product dis-

4. 

pensed).

 The gear motor moves to its home position (the dregs are expelled automatically).

5. 

Содержание Xsmall Plus

Страница 1: ...hts reserved This document and all the information herein is provided without liability deriving from any errors or omissions Furthermore no part may be reproduced used or collected except where expre...

Страница 2: ...Technical specifications 1 2 2 Machine parameters and performance 2 3 Brief instructions 3 1 Customer and programming menu 1 3 2 Operation cleaning and maintenance 3 4 Operating logic 4 1 Water circui...

Страница 3: ...electronics 2 7 3 Disassembling the control knob and coffee keys 3 7 4 Disassembling the boiler pin 3 7 5 Disassembling the gear motor 4 7 6 Disassembling the boiler 5 7 7 Disassembling the valve 5 7...

Страница 4: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 1 INTRODUCTION...

Страница 5: ...e Center Programmer 1 3 Material Description Notes Thermal paste Heat resistance 200 C Descaler Saeco Entkalker Grease solvent Personal preference Silicone grease Safe to use with food 1 4 Safety warn...

Страница 6: ...LL 1 5 Xsmall range Xsmall Plus Xsmall Steam Painted details X Water steam valve X X Alarm LED X X Automatic rinse X X Automatic dosage X X Frother X Dispensed coffee memory capacity X X Automatic shu...

Страница 7: ...bean tank Dreg drawer Coffee dispenser Cup rack Drip tray full indicator Drip tray Brewing unit Service hatch 13 Water tank Hot water steam dispensing hose Steam hose protection Control panel Frother...

Страница 8: ...Page 4 4 Rev 00 Jul 2008 Saeco Int 01 INTRODUCTION XSMALL 1 6 2 Internal machine parts Turbine Pump Boiler PW CPU P C B Power cable connector Valve Coffee grinder motor Coffee grinder...

Страница 9: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 2 TECHNICAL SPECIFICATIONS...

Страница 10: ...flat ceramic grinders Hot water steam valve Presblock Automatic dosage Dose adjustment controlled by the electronic system Power consumption During the heating phase approx 5 6 A Dimensions W x H x D...

Страница 11: ...Pulse range Min Max No No WATER HARDNESS CANNOT BE SET DREGS DRAWER Description and values Time out for dreg drawer 5 sec Empty dreg drawer alarm after double coffee is the last product dispensed 8 lo...

Страница 12: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 3 BRIEF INSTRUCTIONS...

Страница 13: ...in this mode The water must be drained out into a recipient by turning the se lector clockwise to the point until the green correct temperature LED remains lit in a fixed manner The flow of water dis...

Страница 14: ...top the red blinking light make sure that all components are insert ed or closed correctly Blinking in an anti clockwise sequence cyclically The machine is performing its rinse automatic cleaning cycl...

Страница 15: ...ion in the water flow rate Descaling cycle frequency Hard ness Water hardness Without limescale filter With limescale filter 1 Soft water up to 7 dH Approx every 3 months 120 litres Approx every 6 mon...

Страница 16: ...Saeco Int Rev 0 Jul 2008 XSMALL CHAPTER 4 OPERATING LOGIC...

Страница 17: ...resblock valve Compensation valve 16 18 bar Steam hose connection Steam hose Compensation valve water outlet Turbine 1300 W boiler To brewing unit Water tank rapid connection Steam valve Pump Traditio...

Страница 18: ...r mushroom valve 3 Mushroom valve support 4 Mushroom valve 5 Sealing OR 1 2 3 4 5 CLOSED for COFFEE When dispensing coffee the mushroom valve opens at 4 bar 0 5 Manual opening when dispensing water Ma...

Страница 19: ...1 see following section The gear motor changes its rotation direction and moves upwards again by approx 1 2 mm The boiler begins to heat water for approx 45 seconds It absorbs all the available heati...

Страница 20: ...re sensor adjustment Temp C R nom k R 20 61 465 8 6 50 17 599 5 9 75 7 214 4 1 80 6 121 3 7 85 5 213 3 4 90 4 459 3 1 100 3 3 2 5 125 1 653 3 9 150 0 893 5 1 4 4 Single microswitch The gear motor is p...

Страница 21: ...ter variations in the pulse frequency with or without coffee If there are no coffee beans operation while empty the number of rotations and therefore the number of pulses will be greater t1 no coffee...

Страница 22: ...ue of the power consumed by the gear motor is lower than the value of the min cur rent the grinding pulses will be increased by 2 If the value of the power consumed by the gear motor is greater than t...

Страница 23: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 5 TROUBLESHOOTING...

Страница 24: ...on notes L0 ON OR ON OFF Microswitch dreg drawer unit hatch blinks once insert unit When the unit is removed and replaced wait for at least 5 sec blinks once insert dreg drawer Always insert the compo...

Страница 25: ...n of the boiler Use an ammeter to check the power consumption is between 5 3 and 6 1 mA Blinks coffee grinder operation coffee grinder sensor Each blink corresponds to one coffee grinder rotation Oper...

Страница 26: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 6 SERVICING MAINTENANCE...

Страница 27: ...e appliance is open 12 Assembly 13 Final inspection test 14 Draining the circuit in winter 15 External cleaning 16 Lubricating the brewing unit with suitable grease 17 Insulation test HG 701 dielectri...

Страница 28: ...nto the cup until the crema separates The crema should come together again to form a complete layer Crema colour Hazel brown Temperature Reading taken while dispensing Thermometer 84 C 4 C Grinding le...

Страница 29: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 7 DISASSEMBLY...

Страница 30: ...iner lid and coffee container then loosen the screws shown 3 4 Slide out the steam hose protection lift the cover at the rear by pressing down gently on the cooling vents to help detach the anchoring...

Страница 31: ...1 Loosen the screw shown and remove the P C B protection 2 Slide out the P C B removing all connections 7 2 Disassembling the electronics Disassembling the CPU 1 Remove the RHS and LHS light guide 2 L...

Страница 32: ...remove the boiler pin 7 4 Disassembling the boiler pin 7 3 Disassembling the control knob and coffee keys Disassembling the Top cover To remove the coffee keys from the control keypad detach them fro...

Страница 33: ...sent microswitch D Brewing unit present microswitch E Microswitch F intercepting the brewing unit home and dispensing phases Remove the gear C that meshes with the motor transmission shaft Remove the...

Страница 34: ...the boiler pin 2 Remove the boiler 3 Remove the gear 4 Loosen the screws shown 7 6 Disassembling the boiler 7 7 Disassembling the valve 1 Loosen the screws shown 2 Loosen the screw and remove the plas...

Страница 35: ...ing the pump and turbine Slide out the support as shown Remove connection 1 slide out the silicone hoses To prevent annoying vibrations when reassembling the pump take extra care when positioning spri...

Страница 36: ...XSMALL 07 DISASSEMBLY 1 Boiler connection 2 Other connections Replacing the hoses 1 Use a suitable pair of pliers to remove the clamp as illustrated 2 Tighten the clamp as illustrated 7 10 Fitting an...

Страница 37: ...07 DISASSEMBLY XSMALL 1 To remove the coffee grinder simply slide it out and remove its connections 2 When replacing it make sure the spring A and the coffee pipe B are positioned correctly 7 11 Disas...

Страница 38: ...rinder from the upper support turn it anti clockwise until it de taches from the bayonet coupling 3 To remove the lower grinder keep the increment pin A locked in position and turn the grinder anti cl...

Страница 39: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 9 WATER CIRCUIT DIAGRAM...

Страница 40: ...9 1 Water circuit diagram...

Страница 41: ...Saeco Int Rev 00 Jul 2008 XSMALL CHAPTER 10 ELECTRICAL DIAGRAM...

Страница 42: ...10 1 Wiring diagram...

Отзывы: