English
Important
This last operation is necessary both to avoid the
jamming and to prevent damaging the grinders.
-
Re-position the geared wheel (ref.
D,
fig. 20) and lock
if by tightening the screws (ref. C, fig. 20).
-
Secure the hopper (ref. 7, fig. 21) by hand-tightening
the screws (ref. B, fig. 21).
-
Open the stop slide (ref.
A,
fig. 22).
-
Assemble the cup heating plate, by re-connecting it to
the water outlet pipe (ref.
B,
fig. 11), and the side
panels (see "6.16 Disassembling/assembling the
cover panes")
-
Re-position the coffee hopper (ref. 1, fig. 21) by first
hooking the front part and then rotating it downwards.
Important
Attention should be paid to the positioning of the
gasket (ref. F, fig. 21) which must fit properly in the
geared wheel (ref. D, fig. 21) and the ring nut (ref. E,
fig. 21).
Important
To resume normal machine operations it is
necessary to verify the correct adjustment of the
grinding.
21
To assemble the coffee grinder it is necessary to:
-
Completely screw the adjustment ring nut (ref. E, fig. 19),
then unscrew it by half a turn.