26
English
Instant products and coffee boilers are refilled also during
the initialisation phase (*).
When the initialisation is complete the warming phase starts
and the heating elements of the boilers are automatically
switched on.
(*) During the initial start-up of the machine make sure the
boilers are actually full by starting the Maintenance and
performing a refill of the coffe boiler and a wash cycle
Perform the grinder adjustment as indicated in the
instructions at point 7.5 after refilling the water circuit.
7.10 Water circuit filling
When the VM is first switched on, it is necessary to fill the
boilers. The instant product boiler is filled automatically,
while the Coffee boiler has to be filled manually using
the appropriate “BOILER FILL” item of the maintenance
menu.
Important
Before powering the machine, thus starting the automatic
installation make sure that the water softener is filled with
water and the air bubbles are removed.
7.10.1 Automatic filling of the
instant product boiler
When switched on, the vending machine fills the instant
product boiler automatically. This operation takes few
minutes. If the filling of the boiler is not successful, the
machine cannot be set into service. The “BOILER FILL
ERR24”message will be shown on the display. Should
it be the case, eliminate the trouble and repeat the
automatic installation, after repairing the failure (11.2 Error
messages). No heating is started until the instant product
boiler is completely full. When the automatic filling is over,
the warming phase starts to last 15 to 20 minutes.
Important
Compress the hose connecting the boiler to the water tank
several times; keep on doing so until the air bubbles which
may have formed have been eliminated (Fig. 64).
Fig. 62
Fig. 63
- load two of the most accessible tubes (fig. 63).
- replace the cover on the cup columns.
- remove the cover of the cup dispensing tube (fig.62).
7.9 First start-up of the
vending machine
Supply the vending machine (following the instructions given
previously) and plug it into the power supply (see 5.8).
At this point the message “
ATLANTE
” will appear on the
display and the self-diagnosis phase is activated to check
the correct positioning of the machine devices.
During the self-diagnosis phase, the following devices are
activated:
-
the brew group, the nozzle arm and the stirrer/
sugar dispenser, to get a correct starting positioning;
-
if necessary, also the cup release motor and the
cup holder will be activated