15
Technical features
•
Operating pressure: max. 10 bar
special pressure step: max. 16 bar
•
Test pressure: 1.3 x operating pressure
•
Connection: right, left, room-side, front-side or
from below are possible
•
Flow temperature:
Hot water to 90°C (194°F)
Maintenance
►
Ventilate the underfloor-convector after com
-
missioning and after lengthy interruptions of
operation.
Directions for installation
DANGER
Life-threatening situation!
►
For devices with electrical components: pro
-
vide a fault protection device during the in-
stallation, tripping limit < 30 mA.
►
Switch off the power supply prior to instal-
lation.
►
Do not attach a cable to the underfloor-con
-
vector.
►
Do not roll cables.
Preparatory work
►
Make sure, that the site is suitable for installa
-
tion, refer to technical data.
►
Select screws and dowels (not included in the
scope of supply) which correspond to the struc
-
tural situation.
►
Make sure, that an acoustic insulation factor is
fitted between the underfloor-convector and sur
-
roundings, all the way around and at the base, e.g.
edge insulation strips or sound insulation.
Installation
►
Remove packaging and check the delivery con
-
tents (Fig. 2):
•
Underfloor-convector
–
for preinstalled adjusting screws and screw
latches (quantity depends on size of the un
-
derfloor-convector, refer to technical data)
–
with preinstalled plastic protective molding
for strips
•
Linear grate/rollout grate (if ordered)
•
Installation cover made from wood, 2- and/or
3-part
•
Installation instructions
►
Remove linear grate/rollout grate and pack for
storage, until it is finally positioned.
NOTE
Damage to the linear/roll-up grids due to incor-
rect handling!
►
Do not subject roll-up grids to point loading,
e.g. involving chair/table legs or ladders.
►
When rolling up the troll-up grids make sure
that the internal tension spring is not over-
stretched or kinked.
►
If desired, attach suitable insulation all around
and on the bottom (Fig. 3).
►
Remove the installation cover completely.
►
Align the underfloor-convector with respect to
position and height on all preinstalled adjust-
able screws (Fig. 4).
►
Fix all preinstalled screw latches in place with
screws and dowels. Turn the front screw latches
inward 45°±10° (Fig. 5-7).
►
Connect heating circuits and, if necessary,
cooling circuits corresponding to the connec-
tion-situation (Figs. 8-10b). The connection
set is optional, shown by dotted lines and
only hand-proof preassembled.
3/4"- counter connection screws, do not twist.
►
With
CFP-ECM 2T / CFP-ECM 4T: connect con
-
densate drain (Fig. 12).
►
Underfloor-convectors having electrical compo
-
nents: electrical connection can be carried out
by an electrician after separate instruction.
►
Activate the underfloor-convector and venti
-
late.
►
Carry out leak testing.
►
If the system is tight, raise the installation cover
(Fig. 13).
►
Before completion of the flooring, make sure
that the underfloor-convector is correctly ori
-
ented. No height adjustment is possible after
the flooring work.
WARNING
Overheating hazard!
►
Do not operate the underfloor-convector
with the installation cover in place.
Final work (Fig. 14)
If the construction work is finished:
►
Remove the installation cover.
►
Remove plastic protective molding for edge
strips.
►
Put linear grate/rollout grate in place.
Содержание Carisma Floor CRP-ECM
Страница 18: ...18 max Ø 10 26 45 10 45 10 1 2 3 4 A3 A1 A2 A4 1 2 5 6 7 8 ...
Страница 20: ......