![SA Sport JFK Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/sa-sport/jfk/jfk_installation-instructions-manual_794377016.webp)
JFK Product & Installation Instructions #8920100 Feb 2, 2015
Pg. 16
5.
Prepare to slide the Rail & Inner Tube Assembly into the Upright Assembly.
(See FIG 8) The locking holes in the Inner Tube Assemblies must face to the
outside of the Uprights. If required spin the inner tubes while holding the rail at
the rail pivots firmly. Ensure that the Inner Tubes are at right angles to the rail
and rotated to align properly with the Upright Tubes.
6.
Release the Snap Lock Device on each Upright and lower the Rail & Inner Tube
Assembly into the Uprights. Pull outward on the Snap Lock Device once the
Inner Tube reaches the pin, lower the rail while releasing the Snap Lock Device
until the 1
st
inner tube hole allows the pin to fall into the locking hole of the
inner tube, the Snap Lock Device is now engaged.
Note: To avoid injury while lowering the rail into position, keep hands
well clear of the inner tubes where they slide into the Uprights.
7.
Position the rail at a height that will be comfortable to work with during the set-
up of the apparatus and engage the Snap Lock Device so that the pin drops into a
hole. Tighten the Spin Lock portion securely by turning it clockwise.
8.
Thread now the 3/8” Flat Head Screw to attach the uprights to the base
tube firmly.
9.
If you are assembling Just for Kids Parallel Bars or Uneven Bars, repeat Steps 1
through 6 with the second Upright Assembly and Rail & Inner Tube Assembly.
Note: To avoid possible injury and/or damage to the first Rail & Inner
Tube Assembly while working with the second Upright, ensure
that the first Assembly is either mounted & locked to the Base
Assemblies or well clear of the working area and cannot be
accidentally tipped over.
3/8” FLAT
HEAD SCREW
BASE TUBE
UPRIGHT END
CONNECTION BLOCK