background image

Electronic Diagram 

Electric Wiring Connection and Trial Operation 

Electric wiring connection 

WARNING

TO BE INSTALED ACCORDING TO AS3000

1. Provide an exclusive circuit for power supply of the air conditioner. Wiring capacity shouldbe suitable.   
2. Install a power switch and fuse matching the air conditioner.
3. Always apply the A/C grounding
4. Type Y attachment-if the supply cord is damaged, it must be replaced by the manufacturer or service agent    

or similar qualifiedpersons in order to avoid a hazard.

Remove the service panel and connect the indoor control 
wiring to outdoor connecting board according to the 
indoor and outdoor wiring diagram

PLEASE NOTE: Cooling only type unit no red and yellow wiring (signal 
wiring): red and black wiring is used for fresh air exchange function

Indoor and outdoor wiring diagram (cooling and heating) 

 

CAUTION

1. Do not connect the wiring incorrectly. Check the wiring again after finishing connecting
2. Screw the connecting terminals on the connecting board tightly

 

3. Confirm the connecting terminals not flexible after screwing by pulling the wiring slightly.

Trial operation 

 

Before trial operation be sure to check for looseness in wiring and mistaken polarity etc

1. Connect the power plug then turn on the mains switch. Observe if the operation indicatorlamp twinkles. If it  

twinkles it proves that there is poor contact with indoor - outdoor signal wiring. Check it again 

2. Trial operation continues for about half an hour in COOL mode according to the operation method (refer  

pages 6 and 7) (For cooling and heating unit select COOL or HEAT depending on season). Cool air is expelled 
from the unit. 

3. Adjust air flow velocity and direction according to the method (refer to page 8). Horizontal vane can be 

changed smoothly and air flow velocity changes.

4. The unit operation should be smooth and steady with no obvious vibration or abnormal noise. If obvious 

vibration or abnormal noise occurs adjust the installation and strength vibration measures.

5. Check indoor drainage making sure there is no drainage leaking. 

CAUTION

1. After trial operation is completed use instructional manual to explain operation procedures to customer
2. Be sure to read this instruction manual before use. Keep this manual handy for later reference. 

20| 

Page

21 | 

Page

Service panel 

Remove the screw

Pin the indoor and outdoor 
connection wiring by using
 the installation kit

Содержание TKF-26GW/BP

Страница 1: ...P 9000BTU TKF R 35GW BP 12000BTU TKF R 50GW BP 18000BTU TKF R 70GW BP 24000BTU TKF R 100GW BP 36000BTU TKF R 120GW BP 41000BTU TKF R 140GW BP 48000BTU SOLAR AIR CONDITIONER OPERATION AND INSTALLATION...

Страница 2: ...ting Page 18 Draining Piping Work Page 18 Sealing of the Wall Hole Fixing of the Piping Page 19 Electric Wiring Connection Trial Operation Page 20 Electric Wiring Connection Page 20 Trial Operation Pa...

Страница 3: ......

Страница 4: ...ration 1 Press the ON OFF button to stop the air conditioner 1 Press the ON OFFbutton to start the air conditioner 2 To select AUTO mode press the Operation select button Each time the button is press...

Страница 5: ...he TIMER ON button and the will flash on the screen 3 When the icon flashes the start timer can be set Press the HOUR and Minute buttons to adjust the required time 4 Once the start time has been set...

Страница 6: ...considering yourhealth we recommend you use the unit as follows If the air conditioner cannot be operated ensure 1 The power plug is connected The switch is turned on and the fuse is not blown 2 The l...

Страница 7: ...humidity etc Cleaning of the Air Filter and Deodorising Filter Cleaning the air filter every 2 weeks 1 Open the front panel to the position as shown and remove the air filter The position of the fron...

Страница 8: ...his is the sound of refrigerant flowing inside the air conditioner 8 Mist appears during COOL operation The indoor warm air is cooled when the room temperature and the humidity is high When the room t...

Страница 9: ...UT 9 52 3 8 12 7 1 2 6 35 1 4 22000 24000 BUT 9 52 3 8 15 88 5 8 9 52 3 8 Pipe Diameter inch Tightening Torque kgf cm 1 4 220 280 3 8 350 420 1 2 530 590 5 8 750 800 3 Refrigerant and drainage piping...

Страница 10: ...rts to increase rapidly stop temporarily then turn through 60 90 angle If the pipe length is more than 3m charge the system with additional refrigerant Draining Piping Work In order to confirm that th...

Страница 11: ...ightly Trial operation Before trial operation be sure to check for looseness in wiring and mistaken polarity etc 1 Connect the power plug then turn on the mains switch Observe if the operation indicat...

Отзывы: