INSTALLATION MANUAL
T7 DIVING SYSTEM™
10
srsmith.com
STEP 2: T7 ASSEMBLY – CONT.
5.
Feed the PVC hose through the base and sit the base on
the springs as shown in photo.
Use hardware kit T7-NSPW and attach the base to the
springs as shown in exploded view on page 11.
Use a dab of anti-seize provided and tighten these now
to 25-30 ft lbs torque.
6.
Tighten the 8 nuts that hold the board to the springs at this time. Torque to 20-25 ft lbs. (Note: all hardware should be tight at this
point of installation)
7.
With the assembly upside down and on protective cardboard move as close as possible to mounting jig. Attach Board Fall
waterfall plumbing as described in installation manual “Install Water Feature” on pages 8 and 9.
8.
The assembly is now ready to set on the jig bolts. With 2 persons carefully set the assembly upright and onto the jig. If installing
an Board Fall waterfall, tuck the excess hose underneath the base as it is set on the jig bolts. Using hardware kit T7-NBK attach
the base to jig as shown in exploded view on page 11. Tighten these nuts to 40-50 ft lbs torque.