3
FRONTIER II JUMP STAND
INSTALLATION CHART
Refer to Fig.1
Frontier II
Stand with
Jump
Board
Length
ANSI/NSPI-5
2003
Pool Type
Distance For Setting
Front Bolt of Jig From
Water’s Edge
“S”
Min. Overhang
± 3”
“WA*”
Max. Height of Board
Above Water
“HOW”
6’
I or II
26”
18”
20”
6’ III
20”
24”
26”
8’ III
34”
24”
26”
6’ IV
14”
30”
30”
8’ IV
28”
30”
30”
FRONTIER II
8’ V
22”
36”
40”
IMPORTANT: The distance for setting the front bolt of the jig “S” from the waters edge is valid only if the
minimum water depth is maintained at the tip of the board noted at point A in ANSI/NSPI-5 2003, Figure 3
and Table 1. If minimum water depth is not maintained the distance “S” must be adjusted accordingly.
*WA DIMENSION IS VALID ONLY IN CONJUNCTION WITH MIN. DEPTH AT POINT A (SEE ANSI/NSPI-5 2003
FIGURE 3 AND TABLE 1) FOR POOL TYPE.
NOTE: When coping is used do not set front bolts of jig closer than 3" from the back edge of coping.
INSTALLATION INSTRUCTIONS
BE SURE CONCRETE DECK SURROUNDING ANCHOR JIG COMPLIES WITH MINIMUM DIMENSIONS AS SHOWN
IN FIG. 1 FOR POOL TYPE AND BOARD TO BE USED.
1.
READ CAREFULLY the following, and pages A through E, which have been extracted from ANSI/NSPI-5 2003 and
pay particular attention to Figure 3 and Table 1 set forth therein.
2.
The Frontier II three-bolt jig should be set in accordance with the INSTALLATION CHART above and Fig. 1, with the
"RED" capped bolt closest to the pool. This will give the desired minimum overhang. Board must be placed at deep
end of pool on centerline.
CAUTION: Before pouring concrete around jig, check the bolt pattern of jig to Fig. 2. It is possible that they have become
misaligned through shipping and handling.
3.
Make sure bolts project out of concrete 1-1/2" with ample concrete depth below jig. Refer to Fig. 1 for minimum deck
thickness, width and length.
4.
When finishing deck surface, maintain a LEVEL DECK SURFACE where jig bolts project out so that the stand makes
uniform contact with deck.
5.
Before mounting stand, chisel away any excess concrete that may have built up around jig bolts and remove the red
and yellow bolt caps.
6.
Place stand over jig bolts and secure according to Fig. 2. Tighten ANCHOR hex nuts. Tighten all MOUNTING and
ANCHOR hex nuts according to the TIGHTENING SCHEDULE in Fig. 1.
7.
With Frontier II stand properly secured, select board size according to INSTALLATION CHART above. Take the
White Rubber Step Bolt Caps and pullover the heads of the 1/2" x 3" long Step Bolts. When inserting Step Bolts
through the board holes, tap with a rubber mallet in order to obtain a snug fit. Secure Frontier II jump board to stand
according to Fig. 2 and tighten MOUNTING hex nuts.
8.
The top surface of the diving board shall be level from side to side.
ONLY ONE PERSON ON A JUMP BOARD AT A
TIME, WITH A MAXIMUM WEIGHT OF 250 LBS.