ETHERLINK II - Repeater
Manual
Page 53 of 106
4.4
Groups of commands requiring confirmation
The following four groups of parameters require confirmation in Etherlink_II devices: LINE, NET,
VLAN and SNMP. Configurations of each group change by using special commands (see Fig.
2.13). The APPLY <name of the group> command is used to apply changes in configurations
performed in a group. After this, the unit applies changes in configurations. If groups LINE, NET,
VLAN were changed not in the local management session via the RS-232 interface of the shelf
but via TELNET the management session breaks and the unit waits for the second connection
within 5 minutes (for the LINE group
– 30 minutes). If the LINE group was changed remotely
(using the CONNECT command), the unit waits for the second connection within 30 minutes. If
within this time the operator did not enter the modem menu, the changed parameters are read
from the startup configuration of the unit. Therefore, it is possible to restore the configurations of
the unit.
A “successful” configuration can become the startup configuration by using the CONFIRM
command.
Содержание SA-REP-ETHERLINK_II-1DA-PL
Страница 18: ...ETHERLINK II Repeater Manual Page 18 of 106 Figure 3 4 View of SA_REG_ETHERLINK_II XDA IP67 devices...
Страница 21: ...ETHERLINK II Repeater Manual Page 21 of 106 3 5 4 2 Jumper Settings V58 unit...
Страница 47: ...ETHERLINK II Repeater Manual Page 47 of 106 3 8 2 3 SNMP...
Страница 49: ...ETHERLINK II Repeater Manual Page 49 of 106...
Страница 98: ...ETHERLINK II Repeater Manual Page 98 of 106 configuration...