RynoWorx RA-MLT-0015 Скачать руководство пользователя страница 25

 

Operation Guide

 

 
Part 2 

– Agitating and Monitoring Temperature 

1.  Never leave melter unattended when the torch is lit. If flame goes out, promptly turn off the flow of gas; 

double check that the melter is free and clear of any gas odors before attempting to re-ignite the torch. 

2.  While your melter is ignited you should continuously be monitoring the material temperature. Check with 

crack sealant manufacture for safe melting temperatures and ensure you continually adjust your regulator 
to maintain the recommended temperature range. If the material becomes too hot, you may need to turn off 
your torch periodically. 

3. 

As material begins to melt, it’s important to consistently agitate. Agitation moves the solid crack sealant 
along the bottom and prevents ‘hot spots’ from forming which can alter the effectiveness of the sealant 
after applied. Agitation also prevents chunks of over-heated material from forming which will eventually  
plug or block your flow valve which can slow down the applications process.  

 

 
Part 3 

– Dispensing Crack Filler 

Once you have effectively liquefied the crack sealant, you may begin applying it. For best results, the surface 
should be clean and free of dirt, debris and vegetation. Ensure shoe is lowered and resting on the pavement. 
Push melter into position, aligning the crack you wish to fill with the center of the shoe. Slowly squeeze the 
valve control arm until crack filler begins to come out of the valve and onto the crack. Slowly push the melter 
forward, keeping the crack aligned with the center of the shoe. Increase speed of the material flow by 
squeezing harder on the valve control arm. If material flow slows, check to ensure that you have enough 
melted material in the kettle and agitate to keep the flow tube clear. 
 

 
Part 4 

– Turning Off and Draining 

Once you have finished using the melter, make sure it is fully drained and no crack filler remains inside the 
kettle or the flow valve. Leaving the flow valve empty after use will prevent the valve from being blocked the 
next time you use the melter. 

 
 
 
 

 

 

Содержание RA-MLT-0015

Страница 1: ...Operator s Manual Model RY10MA V3 Base Model MPN RA MLT 0015 10 Gallon Direct Fire Melter Applicator Torch Model...

Страница 2: ...Facebook Messenger support rynoworx com WhatsApp Messaging 519 404 9775 Website Chat rynoworx com support Email support rynoworx com Phone 855 382 9611...

Страница 3: ...d it must be properly requalified to continue using Ensure that your propane cylinder is within its expiry date for your local jurisdiction The manufacturing date is stamped on the collar of the tank...

Страница 4: ...4 9 RA GCM 0015 1 MA Torch Complete Assembly 10 RA BAS 0078 1 MA10 Torch V3 Handle Bar Assembly 11 RC FAB 0171 1 MA10 Torch V3 Tank Shelf 12 RC FAB 0133 1 Tank Spacer MA V4 13 RC FAB 0101 1 Melter Lid...

Страница 5: ...or Melter Applicator Rear Wheel RA WHL 0005 Front Caster with Wheel RC STK 0001 Flint Striker RC WHL 0014 4 Bolt Caster Swivel RC GCM 0016 Torch for Melter Applicator with Valve RC GCM 0067 Thermomete...

Страница 6: ...our equipment Please make sure you read and follow all instructions provided Within this document you will find the following resources Assembly Setup Instructions These instructions will assist you i...

Страница 7: ...MA10 Torch V3 Tank Shelf 3 RA BAS 0071 1 Valve and Shoe Sub Asy 4 RC FAB 0143 1 Agitation Sweep Bar MA V4 5 RA WHL 0026 2 Rear Wheel Assembly with Bearings Melter Applicator V2 P N Model Rev RA MLT 00...

Страница 8: ...ch V3 Agitation Handle 6 RC FAB 0151 1 Lid Handle MA V4 7 RC FAB 0147 1 Thermometer Guard MA V4 8 RC GCM 0016 1 Torch for Melter Applicator with Valve 9 RC GCM 0068 1 Regulator and Hose 0 30 Psi with...

Страница 9: ...Assembly Instructions 1 Tank Shelf 2 Tank Spacer RK FAS 0066 13 mm Wrench RK FAS 0067 13 mm Wrench...

Страница 10: ...3 Rear Wheels 4 Caster RK FAS 0080 Assemble wheels on axle the side with the bearing retainer ring should be facing out RK FAS 0065 19 mm or Wrench Insert pin...

Страница 11: ...ned so it is perpendicular to the ground before the bolts are tightened The lock washers provided for the valve are shipped in pairs Use 1 pair for each bolt with the wedged surfaces on the washers ma...

Страница 12: ...6 Handle Bars Bend the handle bars over the mounting studs one side at a time RK FAS 0083 19 mm or Wrench...

Страница 13: ...7 Thermometer 8 Thermometer Guard RK FAS 0071 13 mm Wrench Thread the thermometer into the kettle...

Страница 14: ...9 Agitation...

Страница 15: ...Remove the nuts threaded on the studs and install the agitation sweep bar as shown put it over the left stud first and then the right RK FAS 0071 13 mm Wrench...

Страница 16: ...Thread the provided nuts back on the stud and tighten just past flush with the end 19 mm or Wrench 2 x RC NUT 0023...

Страница 17: ...10 Lid Handle RK FAS 0070 13 mm Wrench...

Страница 18: ...11 Shoe Control Arm Insert the shoe control handle into the lower guide Insert the lower end of the shoe control rod into the shoe tab and insert the retaining pin...

Страница 19: ...ove the top cotter pin Insert the lower end of the control rod into the valve connector rod and insert the retaining pin Turn the valve connector rod clockwise until it is tight and then turn it appro...

Страница 20: ...Set Up Adjust Spring Tension The spring tension on the valve control arm can be adjusted by setting the pin position shown below which will increase or decrease the spring tension...

Страница 21: ...Set Up Installing the Torch Connect the torch to the 30 psi adjustable regulator Left hand thread 19 mm wrench Insert the torch into the mounting bracket...

Страница 22: ...ne tank Place your propane tank on the shelf and secure with the ratchet strap Only tighten the ratchet strap so that it is snug do not apply excess force on the brackets Connect the regulator to the...

Страница 23: ...no leaks or physical damage 4 You are outdoors in a well ventilated area that is free and clear of any flammable matter 5 You have completed the assembly of the equipment correctly 6 You have Direct...

Страница 24: ...suring sealant is resting on the bottom of the kettle 5 Remove the torch from the kettle and make sure the valve on the torch handle is fully OPEN by turning it COUNTERCLOCKWISE 6 Slowly turn the regu...

Страница 25: ...ill eventually plug or block your flow valve which can slow down the applications process Part 3 Dispensing Crack Filler Once you have effectively liquefied the crack sealant you may begin applying it...

Страница 26: ...are recommended Description Before Each Use Every 25 Hours Every 75 Hours Check Propane Tank fuel level refill as needed X Inspect regulator and hose for physical damage or leaks X Inspect front cast...

Страница 27: ...ve may not be fully open and therefore restricting fuel flow or your regulator may not be providing enough pressure 3 The wind may be blowing out the flame 1 Refill your fuel tank 2 Ensure your fuel t...

Отзывы: