
2
CAHA Midi
Installation, Usage and Maintenance Instructions
INSTRUCTIONS FOR THE USER
If you have questions concerning the use of your boiler or heating system, please ask your installer. It is in your own inter-
est and that of the installer that you are aware of how to operate your boiler and heating system safely and efficiently.
The appliance is not to be used by children or persons with reduced physical, sensory or mental capabilities,
or lack of experience and knowledge. Children, even if being supervised, must not play with the appliance.
In the case of failure or malfunction of the appliance, do not attempt to repair it yourself. Please contact your
installer. Repairs must only be carried out by qualified technicians. Failure to comply with these requirements can com
-
promise the safety of the appliance.
OPERATION
Water, coming from the radiators or from the DHW unit is heated in the aluminium heat exchanger. The CH or DHW pump
guarantees circulation of water. The air needed for combustion is sucked in by a rpm controlled fan. At low boiler tempera-
tures the flue gases can be cooled down sufficiently for condensation of the water. This water is drained to the sewer via a
built in syphon. This drainage must never be blocked. A burner controller with built in micro processor provides the electri-
cal control of the boiler.
TOPPING UP
The built in manometer indicates if the waterpressure is sufficient. As soon as the water pressure drops below 1 bar top
-
ping up is necessary. If topping up becomes a regular occurrance, your installation should be checked by an installer.
Disconnect from the main. Connect the filling hose to the cold water tap and to the fill and drain valve of the boiler. Before
tightning the coupling in the installation slowly fill the hose with water allowing present air to escape. Now open the fill and
drain valve and slowly fill the installation until a pressure between 1.5 and 2.0 bar is reached. When finished connect again
to the main.
BLEEDING
To remove any air present in the heating system and boiler, bleeding is necessary. Disconnect from the main. Open all the
radiator valves. Bleed the air from all the radiators starting with the ones at the lowest point in the system. After bleeding,
check the water pressure and top-up if required (if water pressure has dropped below 1 bar). Connect to the main again.
Thank you for selecting a CAHA Midi Boiler. This product is the result of extensive research and experience in heating
system design.
This manual is an integral part of the product and should be retained. Please read it carefully, as it provides
important information regarding the installation and maintenance of the product.
The product should only be installed and maintained by a person qualified in the design and installation of heat
-
ing systems. Failure to properly install or maintain the CAHA Midi may lead to injury, death or property damage.
WARNING
Carefully read the instructions contained in the manual as they provide important information regarding safe
installation and maintenance. The installation and maintenance must be performed in accordance with current
standards and according to the manufacturer’s instructions.
In the case of failure or malfunction of the appliance, do not attempt to repair it yourself. Please contact RVR Energy Tech-
nology Ltd by email at [email protected].
Repairs must be only be carried out by a qualified technicians. Failure to comply with these requirements can compro
-
mise the safety of the device.